37 EIA-registered power plants in Norfolk County, MA totalling 2.7 GW of nameplate capacity, ranked and mapped inside ISO-NE.
37 matching plants·ranked by nameplate capacity
| Rank | Plant | Capacity | ||||
|---|---|---|---|---|---|---|
| 1 | Fore River Generating StationCalpine Fore River Energy Center, LLCDetailed profile | 872.2 MW | Natural Gas Fired Combined Cycle | Calpine Fore River Energy Center, LLC | Norfolk County | |
| 2 | ANP Bellingham Energy ProjectBellingham Power Generation LLCDetailed profile | 578 MW | Natural Gas Fired Combined Cycle | Bellingham Power Generation LLC | Norfolk County | |
| 3 | Bellingham Cogeneration FacilityNortheast Energy Associates LP | 386.1 MW | Natural Gas Fired Combined Cycle | Northeast Energy Associates LP | Norfolk County | |
| 4 | Exelon West Medway II LLCConstellation Power, Inc | 263.6 MW | Natural Gas Fired Combustion Turbine | Constellation Power, Inc | Norfolk County | |
| 5 | Medway GridBatteriesDetailed profile | 250 MW | Batteries | — | Norfolk County | |
| 6 | Exelon Medway LLCConstellation Power, Inc | 135 MW | Petroleum Liquids | Constellation Power, Inc | Norfolk County | |
| 7 | Potter Station 2Town of Braintree - (MA) | 116 MW | Natural Gas Fired Combustion Turbine | Town of Braintree - (MA) | Norfolk County | |
| 8 | Exelon Framingham LLCConstellation Power, Inc | 42.6 MW | Petroleum Liquids | Constellation Power, Inc | Norfolk County | |
| 9 | Wilmarth SolarWilmarth Lane Solar 1, LLC | 7.3 MW | Solar Photovoltaic, Batteries | Wilmarth Lane Solar 1, LLC | Norfolk County | |
| 10 | 5 BerryMadison Energy Investments LLC | 7.1 MW | Batteries, Solar Photovoltaic | Madison Energy Investments LLC | Norfolk County | |
| 11 | Kearsarge William WayKearsarge William Way LLC | 7 MW | Batteries, Solar Photovoltaic | Kearsarge William Way LLC | Norfolk County | |
| 12 | Maple(CSG)Maple Street Solar 1, LLC | 6.3 MW | Batteries, Solar Photovoltaic | Maple Street Solar 1, LLC | Norfolk County | |
| 13 | CantonCaptona Canton LLC | 5 MW | Solar Photovoltaic | Captona Canton LLC | Norfolk County | |
| 14 | Solten Plainville 6000, LLCAltus Power America Management, LLC | 4.9 MW | Solar Photovoltaic | Altus Power America Management, LLC | Norfolk County | |
| 15 | Franklin 2CD US Solar MT 2 LLC | 4 MW | Solar Photovoltaic | CD US Solar MT 2 LLC | Norfolk County | |
| 16 | RandolphAltus Power America Management, LLC | 3.8 MW | Solar Photovoltaic | Altus Power America Management, LLC | Norfolk County | |
| 17 | Wellesley College Central Utility PlantWellesley College | 3.8 MW | Natural Gas Internal Combustion Engine | Wellesley College | Norfolk County | |
| 18 | Bird Machine Solar FarmBird Machine Solar Farm, LLC | 3.5 MW | Solar Photovoltaic | Bird Machine Solar Farm, LLC | Norfolk County | |
| 19 | Franklin 1CD US Solar MT 2 LLC | 3 MW | Solar Photovoltaic | CD US Solar MT 2 LLC | Norfolk County | |
| 20 | Town of Needham VNEM CSGTesla Inc. | 3 MW | Solar Photovoltaic | Tesla Inc. | Norfolk County | |
| 21 | Kearsarge Bellingham PVKearsarge Bellingham LLC | 2.9 MW | Solar Photovoltaic | Kearsarge Bellingham LLC | Norfolk County | |
| 22 | Walpole Solar 2Walpole Solar 2, LLC | 2.4 MW | Solar Photovoltaic | Walpole Solar 2, LLC | Norfolk County | |
| 23 | Shuman SolarNuGen Capital Management | 2.2 MW | Solar Photovoltaic | NuGen Capital Management | Norfolk County | |
| 24 | 126 Grove Solar LLCAltus Power America Management, LLC | 2 MW | Solar Photovoltaic | Altus Power America Management, LLC | Norfolk County | |
| 25 | DG Foxborough Elm CSGDG Foxborough Elm LLC | 2 MW | Solar Photovoltaic | DG Foxborough Elm LLC | Norfolk County | |
| 26 | Dynamic - WalpoleAES Distributed Energy | 2 MW | Solar Photovoltaic | AES Distributed Energy | Norfolk County | |
| 27 | One PatriotBloom Energy | 2 MW | Other Natural Gas | Bloom Energy | Norfolk County | |
| 28 | Station 9 Energy Storage SystemTown of Braintree - (MA) | 2 MW | Batteries | Town of Braintree - (MA) | Norfolk County | |
| 29 | Kearsarge Upper UnionKearsarge Upper Union LLC | 1.8 MW | Solar Photovoltaic, Batteries | Kearsarge Upper Union LLC | Norfolk County | |
| 30 | 1 CommercialMadison Energy Investments LLC | 1.5 MW | Batteries, Solar Photovoltaic | Madison Energy Investments LLC | Norfolk County | |
| 31 | 15 LincolnMadison Energy Investments LLC | 1.5 MW | Batteries, Solar Photovoltaic | Madison Energy Investments LLC | Norfolk County | |
| 32 | Town of Foxborough - Landfill (SREC II)Town of Foxborough - Landfill (SREC II) | 1.2 MW | Solar Photovoltaic | Town of Foxborough - Landfill (SREC II) | Norfolk County | |
| 33 | Town of Norfolk MA at Medway BranchLuminace Solar Massachusetts, LLC | 1.2 MW | Solar Photovoltaic | Luminace Solar Massachusetts, LLC | Norfolk County | |
| 34 | Boston Scientific SolarRWE Clean Energy | 1.1 MW | Solar Photovoltaic | RWE Clean Energy | Norfolk County | |
| 35 | Braintree Landfill SolarAmeresco, Inc - Braintree | 1 MW | Solar Photovoltaic | Ameresco, Inc - Braintree | Norfolk County | |
| 36 | Dover (MA)BWC Buckmaster Pond LLC | 1 MW | Solar Photovoltaic | BWC Buckmaster Pond LLC | Norfolk County | |
| 37 | Millis MA 1Millis MA 1 LLC | 1 MW | Solar Photovoltaic | Millis MA 1 LLC | Norfolk County |
County assignment and capacity come from the EIA generator inventory. Capacity is nameplate capacity, not seasonal capability or available operating capacity. A plant can include multiple generators and technologies.