Cedars Rapids
NYISO ↔ Hydro-Québec · AC transmission
A small radial AC connection from Hydro-Québec's Les Cèdres plant into the Massena area of northern New York, scheduled separately from the main Hydro-Québec tie.
What it is carrying
Each operator's own reading, turned into a direction. Where both markets publish the tie, the two should agree.
- As NYISO reports it
- 0 MW · Idle
limit this way 220 MW · 220 MW left to schedule · as of Sep 26, 2:20 PM EDT
Last 30 days
Hourly flow, signed so that up is power leaving the market.
Above zero: NYISO → Hydro-Québec. Below: the reverse.
Hardware
Its terminals. US terminals are placed on the substation HIFLD's national dataset names for them.
- Substation
- Les Cèdres, Québec
In Canada, outside HIFLD's coverage
- Substation
- Moses, NY
45.0041, -74.8044 · 230 kV · nearest mapped substation