MISO logo

MISO–Ontario

MISO ↔ Ontario · Market seam (every AC tie between two markets)

The Michigan–Ontario ties across the St. Clair and Detroit rivers and the separate Minnesota–Ontario 115 kV connection. IESO’s Michigan and Minnesota readings are combined for this market seam; its representative marker is on the Michigan border.

Now
377 MWOntario → MISO
IESO · as of Nov 10, 8:00 PM CST
Loading map…

Operator readings

Compare each operator’s reading at its stated time. Scheduled transfers and metered physical flow measure different things.

As MISO reports it
5 MW · MISO → Ontario

Update overdue · as of Nov 9, 10:00 PM CST

As IESO reports it
377 MW · Ontario → MISO

Current reading · as of Nov 10, 8:00 PM CST

Last 30 days

Hourly readings, signed so that up is power leaving the market. Each series identifies whether it measures flow or a transfer schedule.

-2,000-1,00001,000Latest readingLatest readingOct 15Oct 22Oct 29Nov 5

Above zero: MISO → Ontario. Below: the reverse.

Usual direction
Ontario → MISO in 85% of hours

15% out, 85% in, 1% idle across 578 hours

Average
517 MW · Ontario → MISO
When busy
1,372 MW

95th percentile of hourly flow either way

Peak MISO → Ontario
420 MW
Peak Ontario → MISO
1,635 MW
Direction changes
51
The average day
0:006:0012:0018:0023:00
Mean reading by the market's local hour. Up: MISO → Ontario. Down: Ontario → MISO.

Sources and method

Readings come from MISO and IESO interface readings. Each value is shown with its operator and source time; direction is normalized from that operator’s sign convention toward or away from MISO. A rating describes the equipment; an operator’s posted directional limit, when available, is a separate operating value. The map point identifies a sourced terminal or crossing where available, or a representative connection point; it does not trace the full route.

How intertie coverage is assembled