MISO–PJM seam

MISO ↔ PJM · Market seam (every AC tie between two markets)

Every AC tie between MISO and PJM, from Wisconsin to Kentucky. The busiest market seam in the East, coordinated under a joint operating agreement.

Now
3,399 MWPJM → MISO
PJM · as of Nov 10, 5:40 PM CST
Loading map…

Operator readings

Compare each operator’s reading at its stated time. Scheduled transfers and metered physical flow measure different things.

As MISO reports it
3,419 MW · PJM → MISO

Update overdue · as of Nov 9, 10:00 PM CST

As PJM reports it
3,399 MW · PJM → MISO

Current reading · as of Nov 10, 5:40 PM CST

Last 30 days

Hourly readings, signed so that up is power leaving the market. Each series identifies whether it measures flow or a transfer schedule.

-6,000-4,000-2,00002,000Latest readingLatest readingOct 15Oct 22Oct 29Nov 5

Above zero: MISO → PJM. Below: the reverse.

Usual direction
PJM → MISO in 98% of hours

1% out, 98% in, 0% idle across 581 hours

Average
2,425 MW · PJM → MISO
When busy
4,010 MW

95th percentile of hourly flow either way

Peak MISO → PJM
864 MW
Peak PJM → MISO
5,274 MW
Direction changes
10
The average day
0:006:0012:0018:0023:00
Mean reading by the market's local hour. Up: MISO → PJM. Down: PJM → MISO.

Sources and method

Readings come from MISO and PJM interface readings. Each value is shown with its operator and source time; direction is normalized from that operator’s sign convention toward or away from MISO. A rating describes the equipment; an operator’s posted directional limit, when available, is a separate operating value. The map point identifies a sourced terminal or crossing where available, or a representative connection point; it does not trace the full route.

How intertie coverage is assembled