Operator readings
Compare each operator’s reading at its stated time. Scheduled transfers and metered physical flow measure different things.
- As MISO reports it
- 513 MW · MISO → SPP
Update overdue · as of Nov 9, 10:00 PM CST
Last 30 days
Hourly readings, signed so that up is power leaving the market. Each series identifies whether it measures flow or a transfer schedule.
Above zero: MISO → SPP. Below: the reverse.
- Usual direction
- MISO → SPP in 51% of hours
51% out, 48% in, 1% idle across 581 hours
- Average
- 48 MW · MISO → SPP
- When busy
- 1,236 MW
95th percentile of hourly flow either way
- Peak MISO → SPP
- 2,350 MW
- Peak SPP → MISO
- 3,488 MW
- Direction changes
- 79
Sources and method
Readings come from MISO interface readings. Each value is shown with its operator and source time; direction is normalized from that operator’s sign convention toward or away from MISO. A rating describes the equipment; an operator’s posted directional limit, when available, is a separate operating value. The map point identifies a sourced terminal or crossing where available, or a representative connection point; it does not trace the full route.