IESO logo

Ontario–Québec radial ties

IESO ↔ Hydro-Québec · AC transmission

IESO's smaller Québec intertie zones: AC circuits over which a generator or a block of load is switched from one system to the other, since Québec does not run in synchronism with Ontario.

Now
10 MWIESO → Hydro-Québec
IESO · as of Oct 10, 1:00 PM EDT

What it is carrying

Each operator's own reading, turned into a direction. Where both markets publish the tie, the two should agree.

As IESO reports it
10 MW · IESO → Hydro-Québec

as of Oct 10, 1:00 PM EDT

Last 30 days

Hourly flow, signed so that up is power leaving the market.

As IESO reports it11MW
464-37Sep 10, 2 PMOct 10, 12 PM

Above zero: IESO → Hydro-Québec. Below: the reverse.

Usual direction
IESO → Hydro-Québec in 87% of hours

87% out, 4% in, 9% idle across 719 hours

Average
17 MW · IESO → Hydro-Québec
When busy
33 MW

95th percentile of hourly flow either way

Peak IESO → Hydro-Québec
40 MW
Peak Hydro-Québec → IESO
32 MW
Direction changes
10
The average day
0:006:0012:0018:0023:00
Mean flow by the market's local hour. Up: IESO → Hydro-Québec. Down: Hydro-Québec → IESO.

Sources and method

Flow comes from IESO interface readings. Each value is shown with its operator and source time; direction is normalized from that operator’s sign convention toward or away from IESO. A rating describes the equipment; an operator’s posted directional limit, when available, is a separate operating value. The map point identifies a sourced terminal or crossing where available, or a representative connection point; it does not trace the full route.

How intertie coverage is assembled