Ontario–Québec radial ties
IESO ↔ Hydro-Québec · AC transmission
IESO's smaller Québec intertie zones: AC circuits over which a generator or a block of load is switched from one system to the other, since Québec does not run in synchronism with Ontario. The grouped reading uses an approximate Québec South reference from IESO's illustrative map; it does not place each individual circuit.
Operator readings
Compare each operator’s reading at its stated time. Scheduled transfers and metered physical flow measure different things.
- As IESO reports it
- 7 MW · IESO → Hydro-Québec
Current reading · as of Nov 24, 8:00 PM EST
Last 30 days
Hourly readings, signed so that up is power leaving the market. Each series identifies whether it measures flow or a transfer schedule.
Above zero: IESO → Hydro-Québec. Below: the reverse.
- Usual direction
- IESO → Hydro-Québec in 68% of hours
68% out, 20% in, 13% idle across 719 hours
- Average
- 29 MW · IESO → Hydro-Québec
- When busy
- 69 MW
95th percentile of hourly flow either way
- Peak IESO → Hydro-Québec
- 75 MW
- Peak Hydro-Québec → IESO
- 16 MW
- Direction changes
- 5
Sources and method
Readings come from IESO interface readings. Each value is shown with its operator and source time; direction is normalized from that operator’s sign convention toward or away from IESO. A rating describes the equipment; an operator’s posted directional limit, when available, is a separate operating value. The map point identifies a sourced terminal or crossing where available, or a representative connection point; it does not trace the full route.