IESO logo

Ontario–Québec radial ties

IESO ↔ Hydro-Québec · AC transmission

IESO's smaller Québec intertie zones: AC circuits over which a generator or a block of load is switched from one system to the other, since Québec does not run in synchronism with Ontario. The grouped reading uses an approximate Québec South reference from IESO's illustrative map; it does not place each individual circuit.

Now
7 MWIESO → Hydro-Québec
IESO · as of Nov 24, 8:00 PM EST
Loading map…

Operator readings

Compare each operator’s reading at its stated time. Scheduled transfers and metered physical flow measure different things.

As IESO reports it
7 MW · IESO → Hydro-Québec

Current reading · as of Nov 24, 8:00 PM EST

Last 30 days

Hourly readings, signed so that up is power leaving the market. Each series identifies whether it measures flow or a transfer schedule.

-250255075Latest readingOct 29Nov 5Nov 12Nov 19

Above zero: IESO → Hydro-Québec. Below: the reverse.

Usual direction
IESO → Hydro-Québec in 68% of hours

68% out, 20% in, 13% idle across 719 hours

Average
29 MW · IESO → Hydro-Québec
When busy
69 MW

95th percentile of hourly flow either way

Peak IESO → Hydro-Québec
75 MW
Peak Hydro-Québec → IESO
16 MW
Direction changes
5
The average day
0:006:0012:0018:0023:00
Mean reading by the market's local hour. Up: IESO → Hydro-Québec. Down: Hydro-Québec → IESO.

Sources and method

Readings come from IESO interface readings. Each value is shown with its operator and source time; direction is normalized from that operator’s sign convention toward or away from IESO. A rating describes the equipment; an operator’s posted directional limit, when available, is a separate operating value. The map point identifies a sourced terminal or crossing where available, or a representative connection point; it does not trace the full route.

How intertie coverage is assembled