Middletown Energy Center (combustion turbine) (MIDLTWN2 LOAD) is a PJM market pricing point in the DEOK zone. It is a pricing location, not a physical asset; its locational marginal price represents the marginal value of electricity at this point on the grid.
- Current real-time LMP
- —
- Waiting for the latest settlement
- Typical price
- —
- No trailing price profile
- Grid location
- DEOK zone
- Market pricing location
- Mapped facility
- No direct facility mapping
- No physical facility crosswalk published
Asset facts
Market identity, price telemetry, and nearby grid context.
- Settlement point
- LOAD settlement point
PJM settlement point 1869184556.
- Grid location
- DEOK zone
Map coordinate 39.4650, -84.3478.
- Nearest power plant
- Middletown Energy Center
0.1 miles away · 543.9 MW · natural gas