Find CAISO power assets
Search the CAISO fleet by plant, operator, technology, or county. Compare nameplate capacity, inspect sites, and open source-backed profiles.
- Registry assets
- 1,593
- EIA nameplate capacity
- 93 GW
- Detailed profiles
- 0
CAISO plant records
Sum across registry records
Source-backed public pages
All CAISO power assets
1,593 matching plants·sorted by capacity, high to low
| Rank | Plant | Capacity | ||||
|---|---|---|---|---|---|---|
| 851 | OlsenOlsen Power Partners | 5 MW | Conventional Hydroelectric | Olsen Power Partners | Shasta County | |
| 852 | Ramona 2MN8 Energy LLC | 5 MW | Solar Photovoltaic | MN8 Energy LLC | San Diego County | |
| 853 | RE Rio Grande Solar LLCMN8 Energy LLC | 5 MW | Solar Photovoltaic | MN8 Energy LLC | Kern County | |
| 854 | Regional Wastewater Control FacilityCity of Stockton MUD | 5 MW | Petroleum Liquids, Other Waste Biomass | City of Stockton MUD | San Joaquin County | |
| 855 | San Gabriel Hydro ProjectLos Angeles County-San Gabriel | 5 MW | Conventional Hydroelectric | Los Angeles County-San Gabriel | Los Angeles County | |
| 856 | Solar Photovoltaic Project #42Southern California Edison Co | 5 MW | Solar Photovoltaic | Southern California Edison Co | Tulare County | |
| 857 | Stony GorgeCity of Santa Clara - (CA) | 5 MW | Conventional Hydroelectric | City of Santa Clara - (CA) | Glenn County | |
| 858 | Tierra Buena Energy StorageVESI 10 LLC | 5 MW | Batteries | VESI 10 LLC | Sutter County | |
| 859 | UC Merced Solar HybridMN8 Energy LLC | 5 MW | Solar Photovoltaic, Batteries | MN8 Energy LLC | Merced County | |
| 860 | Valley Center 2MN8 Energy LLC | 5 MW | Solar Photovoltaic | MN8 Energy LLC | San Diego County | |
| 861 | Victor Dry Farm Ranch AAES Distributed Energy | 5 MW | Solar Photovoltaic | AES Distributed Energy | San Bernardino County | |
| 862 | Victor Dry Farm Ranch BAES Distributed Energy | 5 MW | Solar Photovoltaic | AES Distributed Energy | San Bernardino County | |
| 863 | Welport Lease ProjectSentinel Peak Resources California, LLC | 5 MW | Natural Gas Fired Combustion Turbine | Sentinel Peak Resources California, LLC | Kern County | |
| 864 | Wheeler Ridge 2Madison Energy Investments LLC | 5 MW | Solar Photovoltaic | Madison Energy Investments LLC | Kern County | |
| 865 | Wonderful Orchards - BelridgeWonderful Renewable Energy, LLC. | 5 MW | Solar Photovoltaic | Wonderful Renewable Energy, LLC. | Kern County | |
| 866 | Wonderful Orchards - New ColumbiaWonderful Renewable Energy, LLC. | 5 MW | Solar Photovoltaic | Wonderful Renewable Energy, LLC. | Madera County | |
| 867 | Wonderful Orchards - WestsideWonderful Renewable Energy, LLC. | 5 MW | Solar Photovoltaic | Wonderful Renewable Energy, LLC. | Kern County | |
| 868 | Equinix Lundy Ave. Fuel Cell2016 ESA Project Company, LLC | 4.9 MW | Other Natural Gas | 2016 ESA Project Company, LLC | Santa Clara County | |
| 869 | Lake MathewsMetropolitan Water District of S CA | 4.9 MW | Conventional Hydroelectric | Metropolitan Water District of S CA | Riverside County | |
| 870 | OCSDHybrid-Electric Building Technologies West Los Angeles 1, LLC | 4.9 MW | Batteries | Hybrid-Electric Building Technologies West Los Angeles 1, LLC | Orange County | |
| 871 | Childrens HospitalDTE San Diego COGEN Inc. | 4.8 MW | Natural Gas Fired Combustion Turbine | DTE San Diego COGEN Inc. | San Diego County | |
| 872 | Equinix Caspian Dr. Fuel Cell2016 ESA Project Company, LLC | 4.8 MW | Other Natural Gas | 2016 ESA Project Company, LLC | Santa Clara County | |
| 873 | IGS OXR1Greenbacker Renewable Energy Corporation | 4.8 MW | Solar Photovoltaic | Greenbacker Renewable Energy Corporation | Ventura County | |
| 874 | Kaiser Napa Valley Corporate Dr Fuel Cel2016 ESA Project Company, LLC | 4.8 MW | Other Natural Gas | 2016 ESA Project Company, LLC | Napa County | |
| 875 | Lincoln LandfillEnergy 2001 Inc | 4.8 MW | Landfill Gas | Energy 2001 Inc | Placer County | |
| 876 | Gas Utilization FacilityCity of San Diego | 4.6 MW | Other Waste Biomass | City of San Diego | San Diego County | |
| 877 | Nachtigall 1836-WDStandard Solar | 4.6 MW | Solar Photovoltaic | Standard Solar | Kern County | |
| 878 | Power Generation Station (PGS) 2East Bay Municipal Util Dist | 4.6 MW | Other Waste Biomass | East Bay Municipal Util Dist | Alameda County | |
| 879 | SEPV Cuyama HybridSEPV Cuyama, LLC | 4.6 MW | Solar Photovoltaic, Batteries | SEPV Cuyama, LLC | Santa Barbara County | |
| 880 | Terry 1818-WDStandard Solar | 4.6 MW | Solar Photovoltaic | Standard Solar | Kern County | |
| 881 | W PlantQualcomm Incorporated | 4.6 MW | Natural Gas Fired Combustion Turbine | Qualcomm Incorporated | San Diego County | |
| 882 | Bishop Creek 5Southern California Edison Co | 4.5 MW | Conventional Hydroelectric | Southern California Edison Co | Inyo County | |
| 883 | CA Jurupa Valley 3251 De Forest CircleCatalyze Mira Loma 3251 De Forest Circle Microgrid LLC | 4.5 MW | Solar Photovoltaic | Catalyze Mira Loma 3251 De Forest Circle Microgrid LLC | Riverside County | |
| 884 | Coram Energy LLC (4.5MW)Nextera Energy Resources | 4.5 MW | Onshore Wind Turbine | Nextera Energy Resources | Kern County | |
| 885 | CSU Long Beach Lots 7 & 14MN8 Energy LLC | 4.5 MW | Solar Photovoltaic | MN8 Energy LLC | Los Angeles County | |
| 886 | Equinix Great Oaks Blvd. Fuel Cell2016 ESA Project Company, LLC | 4.5 MW | Other Natural Gas | 2016 ESA Project Company, LLC | Santa Clara County | |
| 887 | FarmersvilleArevon Energy, Inc. | 4.5 MW | Solar Photovoltaic | Arevon Energy, Inc. | Tulare County | |
| 888 | Grossmont HospitalSharp Grossmont Hospital | 4.5 MW | Natural Gas Fired Combustion Turbine | Sharp Grossmont Hospital | San Diego County | |
| 889 | Kaiser - LABloom Energy | 4.5 MW | Other Natural Gas | Bloom Energy | Los Angeles County | |
| 890 | Kern Oil & Refining CoKern Oil & Refining Co | 4.5 MW | Natural Gas Fired Combustion Turbine | Kern Oil & Refining Co | Kern County | |
| 891 | Keysight - Santa RosaBloom Energy | 4.5 MW | Other Natural Gas | Bloom Energy | Sonoma County | |
| 892 | SCV Water - Gladbach Water Treatment Plant Phases I and IISCV Water | 4.5 MW | Solar Photovoltaic | SCV Water | Los Angeles County | |
| 893 | Stenner Creek SolarStenner Creek Solar LLC | 4.5 MW | Solar Photovoltaic | Stenner Creek Solar LLC | San Luis Obispo County | |
| 894 | Sunset Reservoir North BasinDuke Energy Renewables Services | 4.5 MW | Solar Photovoltaic | Duke Energy Renewables Services | San Francisco County | |
| 895 | Wheeler RidgeAgilitas Energy, Inc. | 4.5 MW | Solar Photovoltaic | Agilitas Energy, Inc. | Kern County | |
| 896 | Ameresco ForwardAmeresco Forward, LLC | 4.4 MW | Landfill Gas | Ameresco Forward, LLC | San Joaquin County | |
| 897 | Ameresco San JoaquinAmeresco San Joaquin, LLC | 4.4 MW | Landfill Gas | Ameresco San Joaquin, LLC | San Joaquin County | |
| 898 | Ameresco Vasco RoadAmeresco Vasco Road, LLC | 4.4 MW | Landfill Gas | Ameresco Vasco Road, LLC | Alameda County | |
| 899 | Conflitti SolarCES Electron Farm One, LLC | 4.4 MW | Solar Photovoltaic | CES Electron Farm One, LLC | Fresno County | |
| 900 | Graniterock QuarryCalCom Energy | 4.4 MW | Solar Photovoltaic | CalCom Energy | San Benito County |
Browse the CAISO fleet
Permanent directories organized by operating peer group.
Battery storageBattery and battery-hybrid power plants ranked by EIA-reported nameplate capacity.254plantsSolarUtility-scale solar and solar-hybrid power plants ranked by EIA-reported nameplate capacity.829plantsWindOnshore and offshore wind power plants ranked by EIA-reported nameplate capacity.109plantsNatural gasNatural gas power plants ranked by EIA-reported nameplate capacity.256plantsHydroelectricConventional and pumped-storage hydroelectric plants ranked by EIA-reported nameplate capacity.171plantsNuclearNuclear power plants ranked by EIA-reported nameplate capacity.1plantsBattery storage operatorsCompanies operating battery and battery-hybrid plants in CAISO.
Plant identity and nameplate capacity are anchored to the EIA plant registry and joined to ERCOT market records. The fleet sum is not ERCOT seasonal capability or available operating capacity. Detailed profiles add source-backed equipment, commercial, interconnection, and operating context where available.