Brazoria County Solar Project (Danciger) is a solar power facility with 200 MW of EIA-reported operating capacity in Brazoria County, Texas, registered as EIA Plant ID 66046. Brazoria County Solar Project, LLC is the registered plant entity or operator. Project filings list 575,000 solar panels for the facility. S&B USA acquired the project from Savion LLC in 2021.
Mapped infrastructure geometry associated with this asset.
Solar Photovoltaic
138 kV · Electric Reliability Council of Texas
ERCOT
EIA plant 66046 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| BRZ01 | Solar Photovoltaic | Operating | 200 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| BRZ01 | 200 MW 200 MW summer | Solar Photovoltaic PV | Jul 2022 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Project milestones and public references behind the asset profile.
Brazoria County Solar Project, LLC submitted an application for a limitation on appraised value under Tax Code Chapter 313 to the Columbia-Brazoria Independent School District.
ERCOT · Brazoria County
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
2 ERCOT market resources · Solar
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at DAG_ALL over 365 days (2025-10-27 to 2026-10-26).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Matched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
The Comptroller issued written notice that the application for a limitation on appraised value was completed and approved.
EIA-860 lists generator BRZ01 with this operating date.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Brazoria County Solar Project (Danciger) reports 200 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Brazoria County Solar Project (Danciger) is a Solar Photovoltaic facility in Brazoria County, TX, participating in the ERCOT market.
Brazoria County Solar Project (Danciger) is in Brazoria County, TX, inside the ERCOT balancing area.
Brazoria County Solar Project (Danciger) is operated by Brazoria County Solar Project, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Brazoria County Solar Project (Danciger) reported 391.7 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
Brazoria County Solar Project (Danciger) interconnects at San Bernard Substation, on the Electric Reliability Council of Texas system.
By capacity, Brazoria County Solar Project (Danciger) ranks #152 of 7,597 operating plants of the same technology nationally. It ranks #69 of 242 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.