Fort Bend Solar is a 240 MWac photovoltaic facility in Fort Bend County, Texas. EIA's May 2026 inventory lists one operating generator under Plant ID 63985, with service beginning in October 2023 and Acciona Energy USA Global LLC as the registered operator. Diode Ventures sold ACCIONA a 100% interest in the then-development-stage 240 MWac / 315 MWdc project in September 2020.
Mapped infrastructure geometry associated with this asset.
EIA
ACCIONA
ACCIONA
EIA plant 63985 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| FBS | Solar Photovoltaic | Operating | 240 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| FBS | 240 MW 240 MW summer | Solar Photovoltaic PV | Oct 2023 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Project milestones and public references behind the asset profile.
EIA-860 lists generator FBS with this operating date.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
2 ERCOT market resources · Solar
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at TAV_RN over 365 days (2025-10-26 to 2026-10-25).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Red Tailed Hawk Solar LLC | 360 MW | TX | |
| AEUG Union Solar, LLC | 325 MW | OH | |
| Fort Bend Solar LLCCurrent | 240 MW | TX | |
| La Chalupa, LLC | 198.5 MW | TX | |
| Cunningham Storage | 190 MW | TX | |
| Palmas Wind, LLC | 144.9 MW | TX | |
| High Point Solar LLC | 100 MW | IL | |
| San Roman Wind I, LLC | 95.3 MW | TX |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioAnswered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Fort Bend Solar reports 240 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Fort Bend Solar is a Solar Photovoltaic facility in Fort Bend County, TX, participating in the ERCOT market.
Fort Bend Solar is in Fort Bend County, TX, inside the ERCOT balancing area.
Fort Bend Solar is operated by Acciona Energy USA Global, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Fort Bend Solar reports a commercial operation date of 2023. Current status: operating. Source: EIA Sep 2026.
Fort Bend Solar reported 542.4 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Fort Bend Solar ranks #120 of 7,597 operating plants of the same technology nationally. It ranks #51 of 242 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.