Cutlass Solar II
Cutlass Solar II is a solar power facility with 200 MW of EIA-reported operating capacity in Fort Bend County, Texas, registered as EIA Plant ID 66262. Sabanci Renewables Inc. is the current owner; Cutlass II Solar LLC is the registered plant entity or operator. Sabanci's primary disclosure says the 272 MW project was commissioned at full capacity on May 17, 2024. Financing included a $184M tax-equity investment.
Overview
- Reported capacity
- 200 MW
- EIA-reported plant capacity; other capacity bases are withheld pending reconciliation.
- Technology
- Solar Photovoltaic
- Primary generation technology.
- Registry anchor
- Plant 66262
- Cutlass II Solar LLC · Fort Bend County · ERCOT
- Operating status