Brazoria West is a solar power facility with 200 MW of EIA-reported operating capacity in Brazoria County, Texas, registered as EIA Plant ID 64447. Brazoria West Solar Project, LLC is the registered plant entity or operator. Project filings list 397,000 solar panels for the facility.
Mapped infrastructure geometry associated with this asset.
Solar Photovoltaic
Brazoria West is operating.
ERCOT
ERCOT · Brazoria County
EIA plant 64447 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| GEN1 | Solar Photovoltaic | Operating | 200 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| GEN1 | 200 MW 200 MW summer | Solar Photovoltaic PV | Sep 2022 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
S&B USA (Shikun & Binui) signed a definitive agreement to acquire 100% of the Brazoria West development rights from Savion (announced March 2021).
Therefore the owner_name field is assigned to that EIA-registered project company.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
2 ERCOT market resources · Solar
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at WES_ALL over 365 days (2025-10-26 to 2026-10-25).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
A financial closing tied to the project (tax-equity / project financings) is reported as achieved on November 23, 2021; other sources also report finance activity at construction completion in late 2022.
CIT served as coordinating lead arranger for approximately $210 million of project-level financing (announcement dated November 29, 2021).
EIA-860 lists generator GEN1 with this operating date.
The project completed construction in late 2022 and began generating commercial power in November 2022; Shikun & Binui reported finishing construction and closing debt and tax-equity financing in December 2022.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Brazoria West reports 200 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Brazoria West is a Solar Photovoltaic facility in Brazoria County, TX, participating in the ERCOT market.
Brazoria West is in Brazoria County, TX, inside the ERCOT balancing area.
Brazoria West is operated by Brazoria West Solar Project, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Brazoria West reported 415.6 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Brazoria West ranks #152 of 7,597 operating plants of the same technology nationally. It ranks #69 of 242 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.