Fighting Jays Solar is an operating photovoltaic facility in Fort Bend County, Texas. EIA's May 2026 inventory lists Plant ID 62945 as one 227.5 MW generator operated by AP Solar 2, LLC, with service beginning in June 2022. The broader project was sold to a Copenhagen Infrastructure Partners affiliate in July 2020 as a 350 MWac development. That project-level rating is kept separate from the current EIA plant record. The sale announcement also disclosed a long-term physical-power hedge with Shell Energy and CenterPoint substation construction for the ERCOT interconnection.
Mapped infrastructure geometry associated with this asset.
EIA
AP Solar
EIA
EIA
EIA plant 62945 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| FJSOL | Solar Photovoltaic | Operating | 227.5 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| FJSOL | 227.5 MW 227.5 MW summer | Solar Photovoltaic PV | Jun 2022 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
Shell Energy agreed to purchase physical power; term and contracted MW were not disclosed.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
2 ERCOT market resources · Solar
Observed ERCOT settlement prices at JAY_RN_1 over 365 days (2025-10-26 to 2026-10-25).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
The development was sold to a CIP affiliate at a 350 MWac project scope.
EIA reports June 2022 for the 227.5 MW FJSOL generator.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Fighting Jays Solar Project reports 227.5 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Fighting Jays Solar Project is a Solar Photovoltaic facility in Fort Bend County, TX, participating in the ERCOT market.
Fighting Jays Solar Project is in Fort Bend County, TX, inside the ERCOT balancing area.
Fighting Jays Solar Project is operated by AP Solar 2, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Fighting Jays Solar Project reported 506.2 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
Fighting Jays Solar Project settles at JAY_RN_1.
By capacity, Fighting Jays Solar Project ranks #133 of 7,597 operating plants of the same technology nationally. It ranks #58 of 242 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.