Coleto Creek is a coal-fired power facility with 622.4 MW of EIA-reported nameplate capacity in Goliad County, Texas, registered as EIA Plant ID 6178. Coleto Creek is currently operating; coal operations are scheduled to cease by 2027, with repower the retiring coal facility on-site as a natural-gas-fueled dispatchable plant, with approximately 600–630 MW of capacity. The plant's generating configuration is one conventional steam coal generating unit (Generator 1), using subbituminous coal and an ST steam prime mover.
Mapped infrastructure geometry associated with this asset.
Conventional Steam Coal
Coleto Creek is currently operating; coal operations are scheduled to cease by 2027, with repower the retiring coal facility on-site as a natural-gas-fueled dispatchable plant, with approximately 600–630 MW of capacity.
Coleto Creek is currently operating; coal operations are scheduled to cease by 2027, with repower the retiring coal facility on-site as a natural-gas-fueled dispatchable plant, with approximately 600–630 MW of capacity.
345 kV · South Texas Electric Cooperative (STEC)
EIA plant 6178 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| 1 | Conventional Steam Coal | Operating | 622.4 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| 1 | 622.4 MW 655 MW summer | Conventional Steam Coal ST | Jun 1980 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
EIA-860 lists generator 1 with this operating date.
ERCOT
ERCOT · Goliad County
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
1 ERCOT market resource · Coal / lignite
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at COL_COLETOG1 over 365 days (2025-11-02 to 2026-11-01).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Matched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Sempra Generation and Riverstone announced an agreement to sell the jointly owned 632 MW Coleto Creek plant to International Power for $1.14 billion in cash.
An industry project report described preliminary engineering and a planned baghouse installation at Coleto Creek, with installation scheduled for the first quarter of 2007 and completion targeted for May 2007. The report does not establish a net generation-capacity increase.
A subsidiary of Dynegy Inc. acquired all ownership interests in Coleto Creek Power LP as part of ENGIE's U.S. generation portfolio acquisition. No Coleto Creek-specific consideration disclosed.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Coleto Creek is currently operating; coal operations are scheduled to cease by 2027, with repower the retiring coal facility on-site as a natural-gas-fueled dispatchable plant, with approximately 600–630 MW of capacity.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Coleto Creek reports 622.4 MW coal of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Coleto Creek is a Conventional Steam Coal facility in Goliad County, TX, participating in the ERCOT market.
Coleto Creek is in Goliad County, TX, inside the ERCOT balancing area.
Coleto Creek is operated by Coleto Creek Power LP according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Coleto Creek reported 2,802.3 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
Coleto Creek settles at COL_COLETOG1, interconnects at Coleto Creek Power Station / Coleto Creek station, on the South Texas Electric Cooperative (STEC) system.
By capacity, Coleto Creek ranks #105 of 205 operating plants of the same technology nationally. It ranks #9 of 11 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.