DataBank SAN1 - 12270 World Trade Drive
Operating
Operating
DataBank SAN1 is a colocation facility at 12270 World Trade Drive, Suite 100, in San Diego. Its current specification reports 55,239 IT square feet and 7.2 MW of critical IT load, with 2N power and N+1 cooling. Multiple carrier meet-me rooms and fiber entrances support 16 onsite carriers. DataBank advertises 40 kW+ air-cooling cabinet capability and round-the-clock operation and remote-hands services. The operator announced completion of an expansion in April 2023 and scheduled its grand-opening event for May 23.
The March 2022 announcement proposed a second phase adding 4 MW and bringing total IT capacity to 7.5 MW. A later April 2023 release reported 7.5 MW of power ahead of the grand opening, without specifying its capacity basis.
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 7.2 MW | Critical IT Load | Reported | Exact Asset | — |
| Current DataBank page and Q4 2025 data sheet report 7.2 MW critical IT load. | ||||
| 3.2 MW | Critical IT Load | Target | Exact Asset | — |
| A historical operator video advertised a total facility build-out of 3.2 MW critical IT power for expected completion in Q2 2023. This was a facility-total target, not an additional 3.2 MW expansion increment. | ||||
| 7.5 MW | Capacity basis unspecified | Reported | Exact Asset | 2023-04-27 |
| The April 2023 grand-opening announcement reports 7.5 MW of power; its capacity basis is unspecified. The current facility specification reports 7.2 MW critical IT load. | ||||
Also reported as SAN1, DataBank SAN1 World Trade, San Diego World Trade Data Center.