DataBank Waco ACT1 Data Center
Operating
DataBank ACT1 is a downtown Waco colocation facility at 700 Austin Avenue. The operator reports 0.8 MW of critical IT load, 14,210 square feet of IT space and 12 onsite carriers, with 2N power and N+1 cooling designs. DataBank markets ACT1 as a disaster-recovery option for major Texas cities and offers third-floor office space alongside its colocation services.
Loading map…
Overview
- Exact-site power
- 0.8 MW
- Critical IT Load · Reported
- Status
- Operating
- Operating facility
- IT floor area
- 14,210 sq ft
- Facility
- Compute profile
- Colocation · Cloud
- Cooling design
- air
- N+1 Cooling Design; 10kW+ Cab Density Air
- Project scope
Power and grid
- Utility
- Hilco Electric Cooperative, Inc.
The site also falls inside the Heart Of Texas Electric Coop and Navasota Valley Elec Coop, Inc service territories.
- Market
- Nearest substations
- Unnamed substation138 kV
Facility and development
- IT floor area (sq ft)
- 14,210
- Facility class
- Colocation · Cloud
- Cooling systems
- N+1 Cooling Design; 10kW+ Cab Density Air
- Cooling medium
- air
- Fiber and connectivity