DataBank Westway Park II Data Center (HOU2)
Operating
DataBank HOU2 occupies 5170 Westway Park Boulevard on the three-facility Westway Park campus in Houston. The operator reports 79,520 IT square feet, 9 MW of critical IT load and 40 onsite carriers, with N+1 power and N+2 cooling. Advertised cabinet-density capabilities are 10 kW+ with air cooling and 25 kW+ with liquid cooling. Connectivity includes partner peering, direct cloud access and metro interconnect. DataBank describes shared campus supply from an off-site CenterPoint Energy substation with multiple 25 MW feeds. HOU2 offers round-the-clock operation and remote hands, with smart hands by special request.
Overview
- Exact-site power
- 9 MW
- Critical IT Load · Reported
- Status
- Operating
- Operating facility
- IT floor area
- 79,520 sq ft
- Facility
- Compute profile
- Colocation
- Cooling design
- air and liquid
- N+2 Cooling Design · Air cooling (10kW+ cab density) · Liquid cooling (25kW+ cab density)
- Project scope
Power and grid
- Utility
- Entergy Texas Inc.
The site also falls inside the San Bernard Electric Coop, Inc service territory.
- Market
- Substation
The shared Westway Park campus receives power from an off-site CenterPoint Energy substation through multiple 25 MW feeds, according to DataBank.
- Nearest substations
- Addicks345 kV
Facility and development
- IT floor area (sq ft)
- 79,520
- Facility class
- Colocation
- Cooling systems
- N+2 Cooling Design · Air cooling (10kW+ cab density) · Liquid cooling (25kW+ cab density)
- Cooling medium
- air and liquid
- Fiber and connectivity