Desert Sunlight 250, LLC is a solar power facility with 249.7 MW of EIA-reported operating capacity in Riverside County, California, registered as EIA Plant ID 58542. Commercial operation began in December 2014. The facility interconnects at Red Bluff Substation at 230 kV.
Mapped infrastructure geometry associated with this asset.
Solar Photovoltaic
Desert Sunlight 250, LLC is operating.
230 kV · Southern California Edison Company (SCE)
EIA plant 58542 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| DSL12 | Solar Photovoltaic | Operating | 39.1 | Unknown |
| DSL13 | Solar Photovoltaic | Operating | 39.1 | Unknown |
| DSL14 | Solar Photovoltaic | Operating | 26.5 | Unknown |
| DSL15 | Solar Photovoltaic | Operating | 13.9 | Unknown |
| DSL16 | Solar Photovoltaic |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| DSL12 | 39.1 MW 39.1 MW summer | Solar Photovoltaic PV | Dec 2013 | Operating |
| DSL13 | 39.1 MW 39.1 MW summer | Solar Photovoltaic PV | Jan 2014 | Operating |
| DSL14 | 26.5 MW 26.5 MW summer | Solar Photovoltaic PV | Apr 2014 | Operating |
| DSL15 | 13.9 MW 13.9 MW summer | Solar Photovoltaic PV | Jun 2014 | Operating |
| DSL16 | 22.7 MW 22.7 MW summer | |||
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
First Solar reported that construction of the Desert Sunlight project had begun in September 2011.
CAISO
CAISO · Riverside County
| Operating |
| 22.7 |
| Unknown |
| DSL17 | Solar Photovoltaic | Operating | 29 | Unknown |
|---|
| DSL18 | Solar Photovoltaic | Operating | 29 | Unknown |
|---|
| DSL19 | Solar Photovoltaic | Operating | 25.2 | Unknown |
|---|
| DSL20 | Solar Photovoltaic | Operating | 25.2 | Unknown |
|---|
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
The U.S. Department of Energy approved a loan guarantee partially supporting $1.46 billion in project loans from private institutional investors and commercial banks, with Goldman Sachs Lending Partners LLC and Citigroup as lead lenders.
EIA-860 lists generator DSL16, generator DSL17, generator DSL20 with this operating date.
EIA-860 lists generator DSL15, generator DSL18 with this operating date.
EIA-860 lists generator DSL19 with this operating date.
First Solar and NRG materials reported commercial operation for the entire Desert Sunlight farm in December 2014.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Desert Sunlight 250 reports 249.7 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Desert Sunlight 250 is a Solar Photovoltaic facility in Riverside County, CA, participating in the CAISO market.
Desert Sunlight 250 is in Riverside County, CA, inside the CAISO balancing area.
Desert Sunlight 250 is operated by NextEra Energy Desert Sunlight 250, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Desert Sunlight 250 reported 555.7 GWh over the twelve months to 2024-12. Figures are net generation as filed to EIA-923.
Desert Sunlight 250 interconnects at Red Bluff Substation, on the Southern California Edison Company (SCE) system.
By capacity, Desert Sunlight 250 ranks #117 of 7,597 operating plants of the same technology nationally. It ranks #23 of 972 in CA.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.