Mockingbird Solar Center is a utility-scale photovoltaic plant in Lamar County, Texas. EIA's May 2026 inventory reports one operating generator at 471 MW AC and 572 MW DC, with commercial operation beginning in October 2024. Ørsted currently describes the operating project as 468 MW and continues to operate it after selling a 50% equity interest to Energy Capital Partners in December 2024. Ørsted also completed a 953-acre conservation donation to The Nature Conservancy alongside the project.
Mapped infrastructure geometry associated with this asset.
EIA May 2026
EIA May 2026
December 2024 farm-down
Retained operating responsibility
EIA plant 64347 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| 7777 | Solar Photovoltaic | Operating | 471 | Unknown |
Mapped infrastructure geometry associated with this asset.
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| 7777 | 471 MW 471 MW summer | Solar Photovoltaic PV | Oct 2024 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
Ørsted announced FID and construction of the 471 MW AC project.
EIA May 2026
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
2 ERCOT market resources · Solar
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at BAKE_RN_ALL over 365 days (2025-10-27 to 2026-10-26).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
EIA reports October 2024 for the operating generator.
Ørsted celebrated operation and completion of the 953-acre conservation donation.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Mockingbird Solar Center reports 471 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Mockingbird Solar Center is a Solar Photovoltaic facility in Lamar County, TX, participating in the ERCOT market.
Mockingbird Solar Center is in Lamar County, TX, inside the ERCOT balancing area.
Mockingbird Solar Center is operated by Mockingbird Solar Center, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Mockingbird Solar Center reported 1,001.5 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Mockingbird Solar Center ranks #15 of 7,597 operating plants of the same technology nationally. It ranks #7 of 242 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.