Delilah Solar Energy II LLC is a 310 MW solar photovoltaic generation facility located in Red River County, Texas. The facility is an indirect wholly owned subsidiary of Invenergy Renewables LLC and is operated by Invenergy Services LLC. It interconnects to the ERCOT market through Oncor Electric Delivery Company's 345 kV transmission system. The project comprises 86 TMEIC Ninja 4.2 MW solar inverters on approximately 4,406 acres. Meta Platforms, Inc. has contracted for 150 MW of environmental attributes from the facility.
Mapped infrastructure geometry associated with this asset.
EIA plant 63884 · Inventory for Aug 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| GEN1 | Solar Photovoltaic | Operating | 310 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| GEN1 | 310 MW 310 MW summer | Solar Photovoltaic Solar · PV | Sep 2025 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
EIA plant 63884 registered with GEN1 at 300 MW nameplate capacity and FERC active date of May 4, 2021.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
3 ERCOT market resources · Solar
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at TTRSW_RN over 365 days (2025-10-17 to 2026-10-16).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Lackawanna Energy Center | 1,498.5 MW | PA | |
| Grays Harbor Energy Facility | 714.9 MW | WA | |
| Nelson Energy Center | 627.5 MW | IL | |
| Hardee Power Station | 470.1 MW | FL | |
| Spindle Hill Energy Center | 420 MW | CO | |
| Invenergy Nelson Expansion LLC | 380 MW | IL | |
| Cannon Falls Energy Center | 346.8 MW | MN | |
| Delilah Solar Energy II LLCCurrent | 310 MW | TX |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioDelilah Solar Energy II LLC filed its application with the Texas Public Utility Commission for renewable-energy-credit generator certification.
Oncor Electric Delivery Company LLC filed Amendment No. 1 to the Standard Generation Interconnection Agreement between Oncor and Delilah Solar Energy II LLC with the Texas PUC.
Commercial operation began for the TMEIC Ninja 4.2 solar inverters (86 units, 310 MW total) at Delilah Solar Energy II LLC as recorded in the Texas PUC renewable-energy certification.
Invenergy announced that Meta Platforms, Inc. signed an Environmental Attribute Purchase Agreement for 150 MW from Delilah II Solar, with expected commercial operations in 2025. The clean-energy attributes from Delilah II will be delivered to the local grid.
EIA-860 lists generator GEN1 with this operating date.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Delilah Solar Energy II reports 310 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Aug 2026.
Delilah Solar Energy II is a Solar Photovoltaic facility in Red River County, TX, participating in the ERCOT market.
Delilah Solar Energy II is in Red River County, TX, inside the ERCOT balancing area.
Delilah Solar Energy II is operated by Invenergy Services LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Delilah Solar Energy II reported 612.1 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Delilah Solar Energy II ranks #39 of 7,597 operating plants of the same technology nationally. It ranks #21 of 242 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.