Estonian Solar Project, LLC is a utility-scale solar-plus-storage hybrid facility located in Delta County, Texas, within the ERCOT balancing area. The project comprises a 204.5 MW solar photovoltaic generation unit with single-axis tracking and bifacial modules, paired with a 100 MW lithium-ion battery energy storage system, for 304.5 MW combined nameplate capacity. Enel North America, through its renewable-energy subsidiary Enel Green Power North America, developed, built, and operates the facility. The facility began operations in February 2025 with staggered unit commissioning. The project is supported by power purchase agreements with BXP, Inc. for 21 MW and with Capri Holdings Limited. Expected annual generation is approximately 499 GWh.
Mapped infrastructure geometry associated with this asset.
EIA plant 66872 · Inventory for Aug 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| BESS | Batteries | Operating | 100 | 158.3 |
| SOLAR | Solar Photovoltaic | Operating | 204.5 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| BESS | 100 MW 100 MW summer | Batteries Electricity used for energy storage · BA | Jan 2025 | Operating |
| SOLAR | 204.5 MW 204.5 MW summer | Solar Photovoltaic Solar · PV | Jun 2025 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
Enel and BXP executed a power purchase agreement for 21 MW of the Estonian Solar Project under construction in Delta County, Texas. Expected online date was late 2024.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
3 ERCOT market resources · Battery / storage, Solar
Cycles/day is discharged energy vs. usable capacity (~168 MWh). Capacity factor is avg discharge vs. peak.
Observed ERCOT settlement prices at ESTONIAN_ALL over 365 days (2025-10-12 to 2026-10-11).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
EIA-860 lists generator BESS with this operating date.
Enel announced that the Estonian solar-plus-storage plant in Delta County, Texas has started operations. The facility comprises a 202 MW solar photovoltaic facility paired with a 125 MW battery energy storage system.
EIA-860 lists generator SOLAR with this operating date.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Estonian Solar Project reports 100 MW battery storage + 204.5 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Aug 2026.
Estonian Solar Project is a Solar Photovoltaic, Batteries facility in Delta County, TX, participating in the ERCOT market.
Estonian Solar Project is in Delta County, TX, inside the ERCOT balancing area.
Estonian Solar Project is operated by Enel Green Power Estonian Solar Project, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Estonian Solar Project reported 456.7 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Estonian Solar Project ranks #146 of 7,597 operating plants of the same technology nationally. It ranks #65 of 242 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.