NedPower Mount Storm
NedPower Mount Storm is a 264 MW onshore wind facility in Grant County, West Virginia, operating along the Allegheny Front since 2008. The project consists of two EIA generators: MS1 (164 MW, 82 turbines, operating since March 2008) and MS2 (100 MW, 50 turbines, operating since December 2008), using Gamesa G80-2.0 equipment. Clearway Energy, Inc. acquired 100% of NedPower Mount Storm LLC on April 23, 2021, from Castleton Commodities International.
