
North Allegheny Windpower Project is a 75 MW onshore wind turbine plant in Blair County. North Allegheny Wind is a 70 MW wind project in Blair and Cambria counties, Pennsylvania. It reached commercial operations in April 2024 after a repowering with Vestas turbines and sells power under a long-term agreement with a corporate offtaker. Deriva Energy, formerly Duke Energy Renewables, is the majority owner, and PGIM provided $49 million of senior secured notes to the project company in February 2025.
EIA plant 56651 · Inventory for Aug 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | Operating | 75 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| 1 | 75 MW 75 MW summer | Onshore Wind Turbine Wind · WT | Sep 2009 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
EIA-860 lists generator 1 with this operating date.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Frontier Windpower II | 351.8 MW | OK | |
| Pisgah Ridge Solar, LLC | 250 MW | TX | |
| Mesquite Creek Wind | 211.2 MW | TX | |
| Ledyard Windpower, LLC | 207 MW | IA | |
| Mesteno | 201.6 MW | TX | |
| Los Vientos Wind 1B | 201.6 MW | TX | |
| Rambler | 200 MW | TX | |
| Los Vientos Windpower IV | 200 MW | TX |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioAnswered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
North Allegheny Windpower Project reports 75 MW wind of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Aug 2026.
North Allegheny Windpower Project is a Onshore Wind Turbine facility in Blair County, PA, participating in the PJM market.
North Allegheny Windpower Project is in Blair County, PA, inside the PJM balancing area.
North Allegheny Windpower Project is operated by Deriva Energy according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
North Allegheny Windpower Project reported 199.5 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, North Allegheny Windpower Project ranks #793 of 1,374 operating plants of the same technology nationally. It ranks #9 of 28 in PA.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.