Old 300 Storage Center is a 250 MW / 500 MWh, two-hour standalone battery energy storage system located at approximately 102 JC Wicks Road, Needville, Texas, in Fort Bend County. The facility uses 166 Tesla Megapack 2XL units and reached commercial operations on August 5, 2026. It is fully integrated into the ERCOT grid and independently operated from the co-located 430 MW Old 300 Solar project. The facility provides grid-stability resources and helps address ERCOT's tight supply-demand periods.
Mapped infrastructure geometry associated with this asset.
EIA plant 68365 · Inventory for Aug 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| 8681 | Batteries | Operating | 250 | 500 |
Similar plants ranked by technology, capacity, and distance.
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| 8681 | 250 MW 250 MW summer | Batteries Electricity used for energy storage · BA | Apr 2026 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
Ørsted announced that construction of the 250 MW/500 MWh battery energy storage system in Needville, Texas had commenced. Expected completion in 2026, with nearly 100 construction jobs anticipated.
EIA-923 reports gross generation and net grid exchange for storage plants. Gross generation is shown as a discharge proxy; it is not a cycle count or conventional capacity factor.
2 ERCOT market resources · Battery / storage
Cycles/day is discharged energy vs. usable capacity (~643 MWh). Capacity factor is avg discharge vs. peak.
Observed ERCOT settlement prices at BCK_RN over 365 days (2025-10-12 to 2026-10-11).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
EIA-860 lists generator 8681 with this operating date.
Old 300 Storage Center reached commercial operations and became fully integrated into the ERCOT grid. The 250 MW/500 MWh BESS is independently operated from Old 300 Solar and provides grid-reliability and grid-stability resources.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Old 300 Storage Center reports 250 MW battery storage of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Aug 2026.
Old 300 Storage Center is a batteries facility in Fort Bend County, TX, participating in the ERCOT market.
Old 300 Storage Center is in Fort Bend County, TX, inside the ERCOT balancing area.
Old 300 Storage Center is operated by Old 300 Storage Center, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Old 300 Storage Center reported 57.8 GWh over the twelve months to 2026-07. For a storage plant this is reported gross generation — a discharge proxy, not a cycle count or a conventional capacity factor.
By capacity, Old 300 Storage Center ranks #33 of 1,061 operating plants of the same technology nationally. It ranks #11 of 254 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.