Paleo
EIA's May 2026 inventory reports 200 MW of nameplate power, 200 MWh of energy capacity and a December 2024 operating month. ENGIE's project page confirms 200 MW and operation in 2024. A May 2024 PUCT settlement identifies ENGIE and BRP Paleo as wholly owned ENGIE affiliates and documents interconnection through Oncor's Blackwater Draw Switch station.
Overview
- Power / energy
- 200 MW / 200 MWh
- EIA May 2026
- Storage duration
- 1 hour
- EIA registry basis
- Interconnection
- Blackwater Draw
- Oncor 345 kV switch station
- Registry anchor
- Plant 65491