Sioux
Sioux Energy Center is a coal-fired plant on the Mississippi River at West Alton in St. Charles County, Missouri, owned and operated by Ameren Missouri. Its two cyclone-boiler units began operating in 1967 and 1968, and news coverage puts its output near 1,099 MW. In July 2026 Ameren Missouri asked regulators to approve a 2,100 MW natural gas combined-cycle plant on the site, expected by the end of 2031, as the coal units are anticipated to close between 2032 and 2035.
Overview
- Registry anchor
- Plant 2107
- plant-2107
Infrastructure record
- Alternate name
- Ameren Sioux Power Plant
- Mapped facility footprint
- Mapped infrastructure footprint
Mapped infrastructure geometry associated with this asset.
