3 EIA-registered plants with 629.9 MW of nameplate capacity inside PJM; the largest is Old Trail Wind Farm at 213.8 MW.
County assignment and capacity come from the EIA generator inventory. Capacity is nameplate capacity, not seasonal capability or available operating capacity. A plant can include multiple generators and technologies.