A back-to-back converter at Oklaunion near Vernon, Texas, linking ERCOT to SPP across the Red River.

Now
22 MWERCOT → SPP
ERCOT · as of Nov 11, 10:40 AM CST
Loading map…

Operator readings

Compare each operator’s reading at its stated time. Scheduled transfers and metered physical flow measure different things.

As ERCOT reports it
22 MW · ERCOT → SPP

Current reading · as of Nov 11, 10:40 AM CST

Last 30 days

Hourly readings, signed so that up is power leaving the market. Each series identifies whether it measures flow or a transfer schedule.

-400-2000200400Latest readingOct 15Oct 22Oct 29Nov 5

Above zero: ERCOT → SPP. Below: the reverse.

Usual direction
SPP → ERCOT in 80% of hours

10% out, 80% in, 10% idle across 720 hours

Average
127 MW · SPP → ERCOT
When busy
219 MW

95th percentile of hourly flow either way

Peak ERCOT → SPP
223 MW
Peak SPP → ERCOT
219 MW
Direction changes
35
Hours near its rating
332 of 720

At 95% or more of 220 MW

The average day
0:006:0012:0018:0023:00
Mean reading by the market's local hour. Up: ERCOT → SPP. Down: SPP → ERCOT.

Hardware

Its terminals, placed from named HIFLD substations or other cited geospatial sources where available.

Converter
Oklaunion, TX

Not in HIFLD's dataset

Sources and method

Readings come from ERCOT interface readings. Each value is shown with its operator and source time; direction is normalized from that operator’s sign convention toward or away from ERCOT. A rating describes the equipment; an operator’s posted directional limit, when available, is a separate operating value. The map point identifies a sourced terminal or crossing where available, or a representative connection point; it does not trace the full route.

How intertie coverage is assembled