CAISO IR/RC Requirements and Awards (3 Days Ahead)
CAISO imbalance reserve and reliability capacity requirements and awards in MW from the run three days ahead, by balancing area group and product.
About this data
Each row is one line of CAISO's report on imbalance reserve (IR) and reliability capacity (RC) requirements and awards from the run three days before the operating day, in MW, by balancing area group and product. It is the earliest of the three runs and shows how requirements and awards are first set before the later runs revise them.
What people use it for
- See the earliest IR and RC awards
- Compare with the two-day-ahead and day-ahead runs
- Track forward changes in reserve requirements
Where to use it
In Ask the Grid
Ask about it, see it live
In ATG Data
Build with the full table
Latest data
Questions
- Which data provider has CAISO IR/RC Requirements and Awards (3 Days Ahead) data?
- Ask the Grid has it, from CAISO market reports. You can browse every row in Ask the Grid Data, query it with SQL or the Ask the Grid API, reach it from an AI assistant over MCP, or ask the grid agent about it in plain English.
- Where does CAISO IR/RC Requirements and Awards (3 Days Ahead) come from?
- It comes from CAISO market reports. This page links to the original publication, so any value can be checked against it.
- How do I download or query CAISO IR/RC Requirements and Awards (3 Days Ahead)?
- Open the atg.caiso_report_ir_rc_requirements_3da table in Ask the Grid Data to browse every row and run SQL against it, call it from code through the Ask the Grid API, or connect an MCP client. Full history can be delivered on a schedule to Snowflake, Databricks or your own storage.
- Can I ask questions about CAISO IR/RC Requirements and Awards (3 Days Ahead) in plain English?
- Yes. The grid agent reads this data when a question needs it, for example "what are caiso's imbalance reserve awards three days ahead", and every answer names the dataset it read.