CAISO IR/RC Requirements and Awards (Day-Ahead)
CAISO imbalance reserve and reliability capacity requirements and awards in MW from the day-ahead run, by balancing area group and product.
About this data
Each row is one line of CAISO's report on imbalance reserve (IR) and reliability capacity (RC) requirements and awards from the day-ahead market run, in MW, by balancing area group and product. It is the day-ahead run of three: the run two days ahead and the run three days ahead have their own series. Use it to see what CAISO asked for and awarded in the final run before the operating day.
What people use it for
- See IR and RC requirements and awards by balancing area group
- Compare the day-ahead run with the earlier runs
- Track how reserves for imbalance are awarded
Where to use it
In Ask the Grid
Ask about it, see it live
In ATG Data
Build with the full table
Latest data
Questions
- Which data provider has CAISO IR/RC Requirements and Awards (Day-Ahead) data?
- Ask the Grid has it, from CAISO market reports. You can browse every row in Ask the Grid Data, query it with SQL or the Ask the Grid API, reach it from an AI assistant over MCP, or ask the grid agent about it in plain English.
- Where does CAISO IR/RC Requirements and Awards (Day-Ahead) come from?
- It comes from CAISO market reports. This page links to the original publication, so any value can be checked against it.
- How do I download or query CAISO IR/RC Requirements and Awards (Day-Ahead)?
- Open the atg.caiso_report_ir_rc_requirements_dam table in Ask the Grid Data to browse every row and run SQL against it, call it from code through the Ask the Grid API, or connect an MCP client. Full history can be delivered on a schedule to Snowflake, Databricks or your own storage.
- Can I ask questions about CAISO IR/RC Requirements and Awards (Day-Ahead) in plain English?
- Yes. The grid agent reads this data when a question needs it, for example "how much imbalance reserve did caiso award day-ahead", and every answer names the dataset it read.