Natural Gas Fired Combined CycleNYISO · Albany Countyplant:plant-2539

Bethlehem Energy Center

GB II New York LLC - Albany County - NYISO

Bethlehem Energy Center is an operating natural-gas-fired combined-cycle electric generating facility located in Glenmont, Albany County, New York, on the west bank of the Hudson River approximately three miles south of Albany. The plant entered commercial service in July 2005 and replaced the predecessor Albany Steam Station on the same site. GB II New York LLC, an indirect subsidiary of Alpha Generation, LLC, owns and operates the facility. The plant is interconnected with the New York Independent System Operator (NYISO) grid at 115 kV. Its configuration consists of three GE 7FA combustion-turbine generators, three Nooter/Eriksen heat-recovery steam generators, and one GE D11 steam-turbine generator, yielding four generating turbine-generator units with reported nameplate capacity of 817 MW summer rating. The facility has an 83-acre site and uses natural gas from Dominion Transmission and Tennessee Gas Pipeline, with Hudson River water for its hybrid wet/dry cooling system. The plant participates in NYISO wholesale markets as a mid-merit merchant generator and has been subject to an interconnection uprate request.

Overview

Key fields

Nameplate capacity
893.1 MW

Canonical EIA plant baseline.

Registry anchor
Plant 2539

plant-2539

Structured profile

Technology
Natural Gas Fired Combined Cycle
Operator
GB II New York LLC

Units and generators

Operating generator records and technology attributes reported through EIA-860.

GeneratorCapacityTechnologyOperationStatus
5194.3 MW
169.1 MW summer
Natural Gas Fired Combined Cycle
Natural Gas · CT
Jul 2005Operating
6194.3 MW
169.1 MW summer
Natural Gas Fired Combined Cycle
Natural Gas · CT
Jul 2005Operating
7194.3 MW
169.1 MW summer
Natural Gas Fired Combined Cycle
Natural Gas · CT
Jul 2005Operating
8310.2 MW
305.4 MW summer
Natural Gas Fired Combined Cycle
Natural Gas · CA
Jul 2005Operating

Performance

Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.

Peer context

Technology capacity
893.1 MW
Natural Gas Fired Combined Cycle
National rank
#121
of 538 operating peers
NY rank
#4
of 39 operating peers

Monthly generation

Download CSV
Latest 12 months
3.37 TWh
Reported net generation
Latest report
Apr 2026
EIA-923 monthly filing
2025 capacity factor
43.9%
Using current reported nameplate capacity
May 2023: 284.9 GWh2023-05Jun 2023: 361 GWhJul 2023: 370.5 GWhAug 2023: 382.2 GWhSep 2023: 371.2 GWhOct 2023: 359.3 GWhNov 2023: 372.9 GWh2023-11Dec 2023: 369.6 GWhJan 2024: 361.4 GWhFeb 2024: 329.3 GWhMar 2024: 20.1 GWhApr 2024: 349.6 GWhMay 2024: 297.3 GWh2024-05Jun 2024: 308 GWhJul 2024: 345.4 GWhAug 2024: 353.8 GWhSep 2024: 347.2 GWhOct 2024: 366 GWhNov 2024: 307.4 GWh2024-11Dec 2024: 253.1 GWhJan 2025: 241.3 GWhFeb 2025: 239.3 GWhMar 2025: 144 GWhApr 2025: 335.3 GWhMay 2025: 325.6 GWh2025-05Jun 2025: 321.7 GWhJul 2025: 337.7 GWhAug 2025: 317.7 GWhSep 2025: 326.1 GWhOct 2025: 369.3 GWhNov 2025: 260.5 GWh2025-11Dec 2025: 213.4 GWhJan 2026: 251.6 GWhFeb 2026: 242.3 GWhMar 2026: 126.3 GWhApr 2026: 276.7 GWh2026-04

Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.

Grid and market context

Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.

Nearby substations

HIFLD infrastructure inventory
IN SERVICE · 115 kV
0.1 km
IN SERVICE
0.4 km
IN SERVICE
0.6 km
IN SERVICE
1.4 km
IN SERVICE
3.0 km

Commercial, land, and environmental record

Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.

Transactions and agreements

Site Acquisition
Oct 1999
PSEG Power New York acquired the Albany Steam Station site (predecessor facility) from Niagara Mohawk Power Corporation. One source specifies October 1999; another states 2000.
PSEG Power New York Inc. · Niagara Mohawk Power Corp.
power-eng.com
Construction Start
Jun 10, 2002
PSEG Power New York Inc. officially began construction of Bethlehem Energy Center (BEC), a 750 MW natural-gas-fired combined-cycle power plant. The groundbreaking ceremony was attended by New York Governor George E. Pataki. Contemporary reporting described the project cost as $400 million.
$400MPSEG Power New York Inc. · New York State (Governor Pataki)
power-eng.com
Schedule Revision
Oct 2002
After considerable on-site work, PSEG revised the estimated completion date of the repowering project to the second quarter of 2005 for reasons of financial prudence. A later technical account reported the total project cost as $500 million.
$500MPSEG Power New York Inc.
powermag.com
Predecessor Decommissioning
Feb 2005
The Albany Steam Station's old switchyard was abandoned in place and decommissioned. Bethlehem Energy Center was built on the predecessor station's site, with site infrastructure and switchyard connections reused.
PSEG Power New York Inc.
powermag.com
Commercial Operation
Jul 2005
Bethlehem Energy Center entered commercial service. One source identifies July 18, 2005 as the commissioning start date. Between July 18, 2005, and June 30, 2006, the plant operated for 3,733 hours and generated 1,835,062 MWh.
PSEG Power New York Inc.
powermag.com

Related parties and identifiers

Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.

Relationship graph

Drag organizations to explore the network. Select a node to pin its details and available page link.

AssetOwner / operatorProject companyMarket / regulatorEquipmentOrganization

Parties and identifiers

RelationshipEntityBasis
Parent companyAlpha Generation, LLCIndirect parent holding company
InvestorArcLight Energy Partners Fund VII, L.P.Majority upstream owner
Former owner / developerPSEG Power New York Inc.Original project developer and predecessor legal entity
Former ownerNiagara Mohawk Power Corp.Predecessor Albany Steam Station owner
Balancing authority / market operatorNew York Independent System Operator, Inc. (NYISO)Grid operator and market operator
Equipment supplierGE Power / GE VernovaCombustion-turbine and steam-turbine supplier
Equipment supplierNooter/EriksenHeat-recovery steam-generator supplier
Owner / acquirerGeneration Bridge II, LLCAcquirer and current parent owner
Grid selectionplant:plant-2539Canonical asset page /nyiso/assets/plant/bethlehem-energy-center.

Reporting portfolio

EIA reporting entity
GB II New York LLC
Entity 65417
Operating portfolio
1 plants
1 states
Reported capacity
893.1 MW
Natural Gas Fired Combined Cycle

Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.

Timeline and sources

Project milestones and public references behind the asset profile.

Project timeline

  1. PSEG acquires Albany Steam Station sitepower-eng.c...

    PSEG Power New York acquired the Albany Steam Station site (predecessor facility) from Niagara Mohawk Power Corporation. One source specifies October 1999; another states 2000.

  2. Construction groundbreaking for Bethlehem Energy Centerpower-eng.c...

    PSEG Power New York Inc. officially began construction of Bethlehem Energy Center (BEC), a 750 MW natural-gas-fired combined-cycle power plant. The groundbreaking ceremony was attended by New York Governor George E. Pataki. Contemporary reporting described the project cost as $400 million.

  3. Construction schedule revised to Q2 2005powermag.com

    After considerable on-site work, PSEG revised the estimated completion date of the repowering project to the second quarter of 2005 for reasons of financial prudence. A later technical account reported the total project cost as $500 million.

  4. Albany Steam Station decommissionedpowermag.com

    The Albany Steam Station's old switchyard was abandoned in place and decommissioned. Bethlehem Energy Center was built on the predecessor station's site, with site infrastructure and switchyard connections reused.

  5. Bethlehem Energy Center enters commercial servicepowermag.com

    Bethlehem Energy Center entered commercial service. One source identifies July 18, 2005 as the commissioning start date. Between July 18, 2005, and June 30, 2006, the plant operated for 3,733 hours and generated 1,835,062 MWh.

  6. NYPSC approves Generation Bridge II acquisitiondocuments.d...

    New York Public Service Commission issued an order (NYPSC Case 21-E-0485) approving the transfer of upstream ownership interests in Bethlehem Energy Center from PSEG Power, LLC to Generation Bridge II, LLC. The order was effective February 18, 2022. NYPSC also authorized Generation Bridge II to enter into indebtedness of up to $455 million to fund the transaction, pay expenses, and support working capital.

  7. Generation Bridge II acquisition closes; PSEG Power New York becomes GB…documents.d...

    Generation Bridge II, LLC consummated its acquisition of PSEG Power New York, LLC (the direct owner of Bethlehem Energy Center). Following the acquisition, PSEG Power New York LLC was renamed GB II New York LLC.

Common questions about Bethlehem Energy Center

Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.

How big is Bethlehem Energy Center?

Bethlehem Energy Center has a reported capacity of 893.1 MW. Source: EIA Form 860M.

What kind of plant is Bethlehem Energy Center?

Bethlehem Energy Center is a Natural Gas Fired Combined Cycle facility in Albany County, NY, participating in the NYISO market.

Where is Bethlehem Energy Center located?

Bethlehem Energy Center is in Albany County, NY, inside the NYISO balancing area.

Who operates Bethlehem Energy Center?

Bethlehem Energy Center is operated by GB II New York LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.

How much electricity does Bethlehem Energy Center generate?

Bethlehem Energy Center reported 3,368.8 GWh over the twelve months to 2026-04. Figures are net generation as filed to EIA-923.

How does Bethlehem Energy Center compare to other plants?

By capacity, Bethlehem Energy Center ranks #121 of 538 operating plants of the same technology nationally. It ranks #4 of 39 in NY.

Co-located assets

Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.

Asset analyst
plant:plant-2539

Ask about Bethlehem Energy Center