Natural Gas Fired Combustion TurbineNYISO · Kings Countyplant:plant-2494

Gowanus Gas Turbines Generating

U S Power Generating Company LLC - Kings County - NYISO

A floating Brooklyn generating station consisting of 32 simple-cycle combustion-turbine units on four power barges. The facility operates as a fast-start peaking resource with dual-fuel capability (natural gas and distillate fuel oil) on 16 of its 32 units. The station has black-start capability and is critical to reliability in NYISO Zone J. The facility was commissioned in June 1971 and remains operational, having been subject to proposed repowering and retirement notices that were withdrawn in April 2026 based on NYISO reliability determinations through May 1, 2029.

Overview

Key fields

Nameplate capacity
300 MW

Canonical EIA plant baseline.

Registry anchor
Plant 2494

plant-2494

Structured profile

Technology
Natural Gas Fired Combustion Turbine
Operator
Alpha Generation Services, LLC (AlphaGen)

Units and generators

Operating generator records and technology attributes reported through EIA-860.

GeneratorCapacityTechnologyOperationStatus
GT1120 MW
19.1 MW summer
Petroleum Liquids
Disillate Fuel Oil · GT
Jun 1971Operating
GT1220 MW
17.1 MW summer
Petroleum Liquids
Disillate Fuel Oil · GT
Jun 1971Operating
GT1320 MW
17.2 MW summer
Petroleum Liquids
Disillate Fuel Oil · GT
Jun 1971Operating
GT1420 MW
17.1 MW summer
Petroleum Liquids
Disillate Fuel Oil · GT
Jun 1971Operating
GT1520 MW
16.5 MW summer
Petroleum Liquids
Disillate Fuel Oil · GT
Jun 1971Operating
GT1620 MW
18 MW summer
Petroleum Liquids
Disillate Fuel Oil · GT
Jun 1971Operating
GT1720 MW
17.6 MW summer
Petroleum Liquids
Disillate Fuel Oil · GT
Jun 1971Operating
GT1820 MW
15.3 MW summer
Petroleum Liquids
Disillate Fuel Oil · GT
Jun 1971Operating
GT2120 MW
17.9 MW summer
Natural Gas Fired Combustion Turbine
Natural Gas · GT
Jun 1971Operating
GT2220 MW
18.8 MW summer
Natural Gas Fired Combustion Turbine
Natural Gas · GT
Jun 1971Operating
GT2320 MW
20.6 MW summer
Natural Gas Fired Combustion Turbine
Natural Gas · GT
Jun 1971Operating
GT2420 MW
19.3 MW summer
Natural Gas Fired Combustion Turbine
Natural Gas · GT
Jun 1971Operating
GT2520 MW
18.6 MW summer
Natural Gas Fired Combustion Turbine
Natural Gas · GT
Jun 1971Operating
GT2620 MW
20.3 MW summer
Natural Gas Fired Combustion Turbine
Natural Gas · GT
Jun 1971Operating
GT2720 MW
19.6 MW summer
Natural Gas Fired Combustion Turbine
Natural Gas · GT
Jun 1971Operating
GT2820 MW
17.7 MW summer
Natural Gas Fired Combustion Turbine
Natural Gas · GT
Jun 1971Operating
GT3120 MW
17.7 MW summer
Natural Gas Fired Combustion Turbine
Natural Gas · GT
Jul 1971Operating
GT3220 MW
17.7 MW summer
Natural Gas Fired Combustion Turbine
Natural Gas · GT
Jul 1971Operating
GT3320 MW
19.8 MW summer
Natural Gas Fired Combustion Turbine
Natural Gas · GT
Jul 1971Operating
GT3420 MW
17.9 MW summer
Natural Gas Fired Combustion Turbine
Natural Gas · GT
Jul 1971Operating
GT3520 MW
19 MW summer
Natural Gas Fired Combustion Turbine
Natural Gas · GT
Jul 1971Operating
GT3620 MW
17.6 MW summer
Natural Gas Fired Combustion Turbine
Natural Gas · GT
Jul 1971Operating
GT3720 MW
18.1 MW summer
Natural Gas Fired Combustion Turbine
Natural Gas · GT
Jul 1971Operating
GT3820 MW
19 MW summer
Natural Gas Fired Combustion Turbine
Natural Gas · GT
Jul 1971Operating
GT4120 MW
16.8 MW summer
Petroleum Liquids
Disillate Fuel Oil · GT
Jul 1971Operating
GT4220 MW
17.3 MW summer
Petroleum Liquids
Disillate Fuel Oil · GT
Jul 1971Operating
GT4320 MW
17.6 MW summer
Petroleum Liquids
Disillate Fuel Oil · GT
Jul 1971Operating
GT4420 MW
17.1 MW summer
Petroleum Liquids
Disillate Fuel Oil · GT
Jul 1971Operating
GT4520 MW
17.1 MW summer
Petroleum Liquids
Disillate Fuel Oil · GT
Jul 1971Operating
GT4620 MW
18.6 MW summer
Petroleum Liquids
Disillate Fuel Oil · GT
Jul 1971Operating
GT4720 MW
16.6 MW summer
Petroleum Liquids
Disillate Fuel Oil · GT
Jul 1971Operating
GT4820 MW
19 MW summer
Petroleum Liquids
Disillate Fuel Oil · GT
Jul 1971Operating

Performance

Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.

Peer context

Technology capacity
320 MW
Petroleum Liquids
National rank
#18
of 705 operating peers
NY rank
#3
of 25 operating peers

Monthly generation

Download CSV
Latest 12 months
10.9 GWh
Reported net generation
Latest report
Dec 2024
EIA-923 monthly filing
2024 capacity factor
0.4%
Using current reported nameplate capacity
Jan 2022: 1.6 GWh2022-01Feb 2022: 602 MWhMar 2022: 0 MWhApr 2022: 255 MWhMay 2022: 1.1 GWhJun 2022: 651 MWhJul 2022: 4.3 GWh2022-07Aug 2022: 5.1 GWhSep 2022: 503 MWhOct 2022: 387 MWhNov 2022: 391 MWhDec 2022: 719 MWhJan 2023: 843 MWh2023-01Feb 2023: 1.4 GWhMar 2023: 735 MWhApr 2023: 640 MWhMay 2023: 732 MWhJun 2023: 949 MWhJul 2023: 1.4 GWh2023-07Aug 2023: 1.1 GWhSep 2023: 986 MWhOct 2023: 782 MWhNov 2023: 928 MWhDec 2023: 885 MWhJan 2024: 395 MWh2024-01Feb 2024: 226 MWhMar 2024: 30 MWhApr 2024: 206 MWhMay 2024: 82 MWhJun 2024: 5.8 GWhJul 2024: 2.1 GWh2024-07Aug 2024: 1.5 GWhSep 2024: 185 MWhOct 2024: 200 MWhNov 2024: 285 MWhDec 2024: 1 MWh2024-12

Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.

Grid and market context

Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.

Nearby substations

HIFLD infrastructure inventory
IN SERVICE · 345 kV
0.3 km
IN SERVICE
0.5 km
NOT AVAILABLE
1.1 km
NOT AVAILABLE
4.8 km
NOT AVAILABLE
4.8 km

Commercial, land, and environmental record

Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.

Transactions and agreements

Project Proposal
2019
Astoria Generating Company proposed repowering the Gowanus facility by replacing the 32 older, less-efficient units with eight larger, more efficient units on two barges. The proposed repowered Gowanus would have a rating of no greater than 590 MW (50 MW less than the existing 640 MW). The proposal also included permanent retirement of the Narrows facility's 16 units.
Astoria Generating Company, L.P.
documents.dps.ny.gov
Regulatory Notice
Jun 2025
AlphaGen submitted formal notices of intent to retire the Gowanus and Narrows generating stations following the Peaker Rule timeframe.
Alpha Generation, LLC
alphagen.com
Regulatory Notice Withdrawal
Apr 16, 2026
AlphaGen formally withdrew the previously submitted notices of intent to retire Gowanus and Narrows after NYISO issued a Short-Term Reliability Process Report determining that continued operation of both facilities was required to maintain reliable electric service in NYISO Zone J through at least May 1, 2029. AlphaGen announced it would continue operating the facilities on a merchant basis.
Alpha Generation, LLC · New York Independent System Operator (NYISO)
alphagen.com
Project Proposal
Mar 16, 2026
AlphaGen submitted a proposal to Con Edison's Request for Information seeking clean and non-emitting reliability solutions. The proposal included repowering the Gowanus and Narrows sites with three new state-of-the-art lower-emitting power barges, each delivering 273 MW of fast-start, dispatchable capacity, for a potential total of 819 MW. The new barges would be hydrogen-ready and reduce emissions intensity by more than 50% compared to existing units.
Alpha Generation, LLC · Eastern Generation, LLC
prnewswire.com

Related parties and identifiers

Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.

Relationship graph

Drag organizations to explore the network. Select a node to pin its details and available page link.

AssetOwner / operatorMarket / regulator

Parties and identifiers

RelationshipEntityBasis
Portfolio operator / asset managerAlpha Generation Services, LLC (AlphaGen)Financing covers a portfolio that includes Gowanus Gas Turbines Generating.
Portfolio project company / ownerEastern Generation, LLCFinancing covers a portfolio that includes Gowanus Gas Turbines Generating.
Former owner / sellerConsolidated Edison Company of New York, Inc. (Con Edison)Former owner and seller (1999)
Balancing authority / market operator / regulatorNew York Independent System Operator (NYISO)Balancing authority and market operator for NYISO Zone J
Transmission owner / interconnecting utilityConsolidated Edison Company of New York, Inc.Transmission owner and substation operator at Gowanus and Greenwood substations
Owner / acquirerAstoria Generating Company Acquisitions, LLC2005 acquirer and former owner
Grid selectionplant:plant-2494Canonical asset page /nyiso/assets/plant/gowanus-gas-turbines-generating.

Reporting portfolio

EIA reporting entity
U S Power Generating Company LLC
Entity 54863
Operating portfolio
3 plants
1 states
Reported capacity
1,551 MW
Natural Gas Fired Combustion Turbine · Natural Gas Steam Turbine
Largest reported plants in this portfolio
Largest reported plantsCapacityState
Astoria Generating Station943 MWNY
Narrows Gas Turbines Generating308 MWNY
Gowanus Gas Turbines GeneratingCurrent300 MWNY

Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.

View full reporting portfolio

Timeline and sources

Project milestones and public references behind the asset profile.

Project timeline

  1. Generators enter operationEIA-860

    EIA-860 lists generator GT11, generator GT12, generator GT13, generator GT14, generator GT15, generator GT16, generator GT17, generator GT18, generator GT21, generator GT22, generator GT23, generator GT24, generator GT25, generator GT26, generator GT27, generator GT28 with this operating date.

  2. Generators enter operationEIA-860

    EIA-860 lists generator GT31, generator GT32, generator GT33, generator GT34, generator GT35, generator GT36, generator GT37, generator GT38, generator GT41, generator GT42, generator GT43, generator GT44, generator GT45, generator GT46, generator GT47, generator GT48 with this operating date.

  3. Reliant Energy acquires Orion Power Holdings (includes Gowanus)nydailynews...

    Reliant Energy acquired Orion Power Holdings, thereby becoming the owner of the Gowanus facility.

  4. Gowanus Repowering Project regulatory proposaldocuments.d...

    Astoria Generating Company proposed repowering the Gowanus facility by replacing the 32 older, less-efficient units with eight larger, more efficient units on two barges. The proposed repowered Gowanus would have a rating of no greater than 590 MW (50 MW less than the existing 640 MW). The proposal also included permanent retirement of the Narrows facility's 16 units.

  5. Retirement notices submitted to NYISOalphagen.com

    AlphaGen submitted formal notices of intent to retire the Gowanus and Narrows generating stations following the Peaker Rule timeframe.

  6. AlphaGen proposes Gowanus and Narrows Repowering Projectsprnewswire....

    AlphaGen submitted a proposal to Con Edison's Request for Information seeking clean and non-emitting reliability solutions. The proposal included repowering the Gowanus and Narrows sites with three new state-of-the-art lower-emitting power barges, each delivering 273 MW of fast-start, dispatchable capacity, for a potential total of 819 MW. The new barges would be hydrogen-ready and reduce emissions intensity by more than 50% compared to existing units.

  7. Withdrawal of Gowanus and Narrows retirement noticesalphagen.com

    AlphaGen formally withdrew the previously submitted notices of intent to retire Gowanus and Narrows after NYISO issued a Short-Term Reliability Process Report determining that continued operation of both facilities was required to maintain reliable electric service in NYISO Zone J through at least May 1, 2029. AlphaGen announced it would continue operating the facilities on a merchant basis.

Common questions about Gowanus Gas Turbines Generating

Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.

How big is Gowanus Gas Turbines Generating?

Gowanus Gas Turbines Generating has a reported capacity of 300 MW. Source: EIA Form 860M.

What kind of plant is Gowanus Gas Turbines Generating?

Gowanus Gas Turbines Generating is a Natural Gas Fired Combustion Turbine facility in Kings County, NY, participating in the NYISO market.

Where is Gowanus Gas Turbines Generating located?

Gowanus Gas Turbines Generating is in Kings County, NY, inside the NYISO balancing area.

Who operates Gowanus Gas Turbines Generating?

Gowanus Gas Turbines Generating is operated by U S Power Generating Company LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.

How much electricity does Gowanus Gas Turbines Generating generate?

Gowanus Gas Turbines Generating reported 10.9 GWh over the twelve months to 2024-12. Figures are net generation as filed to EIA-923.

How does Gowanus Gas Turbines Generating compare to other plants?

By capacity, Gowanus Gas Turbines Generating ranks #18 of 705 operating plants of the same technology nationally. It ranks #3 of 25 in NY.

Co-located assets

Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.

Asset analyst
plant:plant-2494

Ask about Gowanus Gas Turbines Generating

Investigate technology, capacity, output, price behavior, ownership, and related facilities using this profile plus current grid data.