
Bridgeport Station is a 576.3 MW natural-gas-fired combined-cycle power plant in Bridgeport, Fairfield County, Connecticut, operated by Generation Bridge II Connecticut, LLC under ArcLight Capital Partners ownership. The facility comprises two EIA generators (501 and 502) that entered commercial operation in June 2019 on the existing Bridgeport Harbor Station site. The plant is dual-fuel capable, using natural gas as the primary fuel with ultra-low-sulfur distillate fuel oil as backup. It replaced the site's legacy coal-fired Unit 3, which was retired by PSEG effective May 31, 2021. The combined-cycle configuration includes a single General Electric 7HA.02 combustion turbine exhausting to a heat-recovery steam generator that drives a single steam turbine.
Mapped infrastructure geometry associated with this asset.
EIA plant 568 · Inventory for Aug 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| 501 | Natural Gas Fired Combined Cycle | Operating | 375.7 | Unknown |
| 502 | Natural Gas Fired Combined Cycle | Operating | 200.6 | Unknown |
| 4 | Petroleum Liquids | Retired | 18.6 | Unknown |
| 3 | Conventional Steam Coal | Retired | 400 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| 2 | 163 MW 130.5 MW summer | Petroleum Liquids Residual Fuel Oil · ST | Aug 1961 Retirement: Jun 2013 | Operating |
| 3 | 400 MW 257.6 MW summer | Conventional Steam Coal Subbituminous Coal · ST | Aug 1968 Retirement: Jun 2021 | Operating |
| 4 | 18.6 MW 16.6 MW summer | Petroleum Liquids Kerosene · GT | Oct 1967 Retirement: Oct 2021 | Operating |
| 501 | 375.7 MW 334 MW summer | Natural Gas Fired Combined Cycle Natural Gas · CT | Jun 2019 | |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
The original Bridgeport Harbor Station began providing energy to industrial factories and businesses in southwestern Connecticut.
| 2 | Petroleum Liquids | Retired | 163 | Unknown |
|---|
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
EIA-860 lists generator 2 with this operating date.
EIA-860 lists generator 4 with this operating date.
EIA-860 lists generator 3 with this operating date.
WISVEST purchased Bridgeport Harbor Station from United Illuminating and operated it until PSEG's subsequent acquisition.
EIA-860 lists a planned retirement for generator 2.
EIA-860 lists generator 501, generator 502 with this operating date.
PSEG announced that the 485 MW combined-cycle Bridgeport Harbor Station 5 was online and available to provide power to Connecticut homes and businesses.
PSEG retired Unit 3, the site's approximately 400 MW coal-fired unit, effective May 31, 2021, following the new gas-fired Unit 5 entering service.
EIA-860 lists a planned retirement for generator 3.
A Connecticut regulatory filing stated that Bridgeport Harbor Station had been subdivided into a parcel containing Unit 5 and a separate parcel containing Units 1–4. Generation Bridge II was designated as the new upstream owner of Unit 5.
EIA-860 lists a planned retirement for generator 4.
Generation Bridge II, LLC, a wholly owned subsidiary of ArcLight Energy Partners Fund VII, L.P., completed the acquisition of PSEG's fossil generation assets in New York and Connecticut, including Bridgeport Harbor Station Unit 5.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Bridgeport Station reports 576.3 MW natural gas of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Aug 2026.
Bridgeport Station is a Natural Gas Fired Combined Cycle facility in Fairfield County, CT, participating in the ISO-NE market.
Bridgeport Station is in Fairfield County, CT, inside the ISO-NE balancing area.
Bridgeport Station is operated by Generation Bridge II Connecticut, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Bridgeport Station reported 3,214.7 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Bridgeport Station ranks #272 of 540 operating plants of the same technology nationally. It ranks #5 of 11 in CT.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.