Camden Plant Holding LLC
The facility consists of one General Electric Frame 7 EA combined-cycle combustion turbine with a supplementary-fired heat-recovery steam generator, a selective catalytic-reduction system, a carbon-monoxide catalyst, and a 17.5 MMBtu/hour auxiliary boiler. Pipeline-quality natural gas is the primary fuel; ultra-low-sulfur distillate is authorized as backup fuel. EIA identifies GEN1 as a 95.2 MW combined-cycle combustion-turbine part and GEN2 as a 77.7 MW combined-cycle steam part with duct burners, for 172.9 MW of nameplate capacity. Both generators are recorded as operating, with no uprate or derate completed. The facility operated at 570 Chelton Avenue, Camden, New Jersey since February 1993.
