French Island
French Island reports 30.4 MW biomass + 157.6 MW petroleum in MISO.
French Island reports 30.4 MW biomass + 157.6 MW petroleum in MISO.
Mapped infrastructure geometry associated with this asset.
EIA plant 4005 · Inventory for Aug 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| 1 | Municipal Solid Waste | Operating | 15.2 | Unknown |
| 2 | Municipal Solid Waste | Operating | 15.2 | Unknown |
| 3 | Petroleum Liquids | Operating | 78.8 | Unknown |
| 4 | Petroleum Liquids | Operating | 78.8 | Unknown |
Mapped infrastructure geometry associated with this asset.
Similar plants ranked by technology, capacity, and distance.
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| 1 | 15.2 MW 9 MW summer | Municipal Solid Waste Municipal Solid Waste (All) · ST | Jan 1940 Retirement: Jun 2030 | Operating |
| 2 | 15.2 MW 7 MW summer | Municipal Solid Waste Municipal Solid Waste (All) · ST | Jan 1948 Retirement: Jun 2030 | Operating |
| 3 | 78.8 MW 61 MW summer | Petroleum Liquids Disillate Fuel Oil · GT | Sep 1974 Retirement: Jun 2030 | Operating |
| 4 | 78.8 MW 58 MW summer | Petroleum Liquids Disillate Fuel Oil · GT | Nov 1974 Retirement: Jun 2030 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Sherburne County | 1,704 MW | MN | |
| Prairie Island | 1,186.2 MW | MN | |
| Monticello Nuclear Facility | 685 MW | MN | |
| High Bridge | 644 MW | MN | |
| Allen S King | 598.4 MW | MN | |
| Riverside (MN) | 585.9 MW | MN | |
Project milestones and public references behind the asset profile.
EIA-860 lists generator 1 with this operating date.
EIA-860 lists generator 2 with this operating date.
EIA-860 lists generator 3 with this operating date.
EIA-860 lists generator 4 with this operating date.
EIA-860 lists a planned retirement for generator 1, generator 2, generator 3, generator 4.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
French Island reports 30.4 MW biomass + 157.6 MW petroleum of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Aug 2026.
French Island is a Municipal Solid Waste, Petroleum Liquids facility in La Crosse County, WI, participating in the MISO market.
French Island is in La Crosse County, WI, inside the MISO balancing area.
French Island is operated by Northern States Power Co - Minnesota according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
French Island reported 68.1 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, French Island ranks #44 of 726 operating plants of the same technology nationally. It ranks #2 of 14 in WI.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.