Hopkins Energy
Hopkins Solar is a 250 MW photovoltaic facility in Hopkins County, Texas. EIA's May 2026 inventory lists one operating generator under Plant ID 67424, with service beginning in June 2024 and Hopkins Energy LLC as the registered operator. ENGIE describes the project as a long-term owned and operated 250 MW ERCOT asset and reports operation since 2023. A Texas regulatory filing identifies Hopkins Energy LLC as an indirect ENGIE subsidiary and Oncor as the interconnection counterparty. The different operation dates are retained with their source scopes rather than collapsed into one date.
Overview
- Operating capacity
- 250 MW
- EIA and ENGIE
- EIA service month
- Jun 2024
- Plant 67424
- Developer operation year
- 2023
- ENGIE
- Registry anchor
- Plant 67424
- Hopkins Energy LLC