Operating combined-cycle natural-gas cogeneration facility at 1 Sheridan Drive, Tonawanda, Erie County, New York, owned and operated by Indeck-Yerkes Limited Partnership. The facility comprises two operating generators with 40.6 MW and 19.3 MW nameplate capacity (totaling approximately 59.9 MW). It uses a General Electric Frame 6 (PG6541(B)) gas turbine and a GE steam turbine in a 1×1 combined-cycle configuration. Commercial operation began in December 1989. The facility provides electricity to the open market and historically supplied up to 75,000 lb/hr of low-pressure steam to the adjoining DuPont-Yerkes production plant.
Mapped infrastructure geometry associated with this asset.
EIA plant 50451 · Inventory for Aug 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| GEN1 | Natural Gas Fired Combined Cycle | Operating | 40.6 | Unknown |
| GEN2 | Natural Gas Fired Combined Cycle | Operating | 19.3 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| GEN1 | 40.6 MW 46.5 MW summer | Natural Gas Fired Combined Cycle Natural Gas · CT | Dec 1989 | Operating |
| GEN2 | 19.3 MW 16.1 MW summer | Natural Gas Fired Combined Cycle Natural Gas · CA | Dec 1989 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
A New York environmental permit states that the Tonawanda cogeneration facility commenced operation in 1988.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Indeck-Yerkes contracted with its affiliate Indeck Gas Supply Corporation for Canadian natural gas. The arrangement contemplated up to 4.5 Bcf per year for 15 years beginning November 1, 1990, with delivery through National Fuel and related pipeline facilities.
The Department of Energy conditionally authorized Indeck-Yerkes to import Canadian natural gas for the facility. The facility was described as a 53-MW qualifying cogeneration facility being constructed adjacent to the existing DuPont-Yerkes plant, with steam service for DuPont-Yerkes and electricity sales to Niagara Mohawk.
The Indeck-Yerkes LGIA specifies December 1989 as the Commercial Operation Date. EIA generator records likewise list December 1989 as the first-operation date for both generator records.
Indeck-Yerkes Limited Partnership, a Delaware limited partnership, filed with FERC for exempt-wholesale-generator status. The Federal Register notice reported that the partnership had been created to own and/or operate the 53-MW Tonawanda cogeneration facility.
National Grid and Indeck-Yerkes executed a power put option agreement containing interconnection terms. The agreement was filed in December 2007 and accepted by FERC in January 2008 under Docket ER08-295.
National Grid and Indeck-Yerkes executed an LGIA designated as NYISO OATT Service Agreement No. 1970. It superseded the prior power put option agreement and governed continued operation and maintenance of the previously constructed facility. The filing was submitted to FERC on March 13, 2013.
A New York permit modification authorized installation of a replacement low-NOx burner and new control system for the auxiliary boiler (Emission Unit Y-00002). The replacement retained the existing 99 MMBtu/hr heat-input rating and was not documented as a repowering or generation-capacity expansion.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Indeck Yerkes Energy Center reports 59.9 MW natural gas of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Aug 2026.
Indeck Yerkes Energy Center is a Natural Gas Fired Combined Cycle facility in Erie County, NY, participating in the NYISO market.
Indeck Yerkes Energy Center is in Erie County, NY, inside the NYISO balancing area.
Indeck Yerkes Energy Center is operated by Indeck-Yerkes Ltd Partnership according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Indeck Yerkes Energy Center reported 20.9 GWh over the twelve months to 2024-12. Figures are net generation as filed to EIA-923.
By capacity, Indeck Yerkes Energy Center ranks #494 of 540 operating plants of the same technology nationally. It ranks #33 of 39 in NY.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.