Sundance Wind Project, LLC is a 199-MW onshore wind facility in Woods County, Oklahoma, consisting of 72 GE Renewable Energy 2.8-MW wind turbines. Sundance is jointly owned by Southwestern Electric Power Company (54.5%) and Public Service Company of Oklahoma (45.5%), both AEP subsidiaries, with PSO serving as the plant operator. transmission.
EIA plant 63489 · Inventory for Aug 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| GEN1 | Onshore Wind Turbine | Operating | 199 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| GEN1 | 199 MW 199 MW summer | Onshore Wind Turbine Wind · WT | Apr 2021 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
PSO and SWEPCO announced that they would seek regulatory approval to purchase the three North Central wind projects, including Sundance.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Northeastern | 1,477.5 MW | OK | |
| Riverside (OK) | 1,121.7 MW | OK | |
| Green Country Power Station | 903.9 MW | OK | |
| Southwestern | 656 MW | OK | |
| Tulsa | 348.2 MW | OK | |
| Comanche (OK) | 290 MW | OK | |
| Maverick Wind Project, LLC | 288 MW | OK | |
| Sundance Wind Project, LLCCurrent | 199 MW | OK |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioPSO received final Oklahoma Corporation Commission approval for acquisition of 675 MW (45.5%) of the North Central projects.
SWEPCO received approval from the Arkansas Public Service Commission for the North Central projects.
AEP received regulatory approvals from Arkansas, Louisiana, Oklahoma, and FERC to acquire the full 1,485 MW North Central wind projects.
Sundance achieved financial close with construction financing including a construction loan and letter of credit.
EIA-860 lists generator GEN1 with this operating date.
Sundance Wind Energy Center began commercial operation in Woods County, Oklahoma, as part of the North Central Energy Facilities.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Sundance Wind Project reports 199 MW wind of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Aug 2026.
Sundance Wind Project is a Onshore Wind Turbine facility in Woods County, OK, participating in the SPP market.
Sundance Wind Project is in Woods County, OK, inside the SPP balancing area.
Sundance Wind Project is operated by Public Service Co of Oklahoma according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Sundance Wind Project reported 653.7 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Sundance Wind Project ranks #340 of 1,374 operating plants of the same technology nationally. It ranks #29 of 71 in OK.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.