Penascal II Wind Project LLC reports 201.6 MW wind in ERCOT.
EIA plant 57095 · Inventory for Aug 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | Operating | 201.6 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| 1 | 201.6 MW 201.6 MW summer | Onshore Wind Turbine Wind · WT | Mar 2010 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Project milestones and public references behind the asset profile.
EIA-860 lists generator 1 with this operating date.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Karankawa Wind LLC | 307.1 MW | TX | |
| La Joya NM | 306.2 MW | NM | |
| Blue Creek Wind Project | 302 MW | OH | |
| Streator Cayuga Ridge South | 300 MW | IL | |
| El Cabo Wind | 298 MW | NM | |
| Klondike Windpower III | 297.5 MW | OR | |
| True North Solar, LLC | 238.8 MW | TX | |
| Patriot Wind Farm | 226.1 MW | TX |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioCapacity from Avangrid nearly doubles.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Penascal II Wind Project reports 201.6 MW wind of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Aug 2026.
Penascal II Wind Project is a Onshore Wind Turbine facility in Kenedy County, TX, participating in the ERCOT market.
Penascal II Wind Project is in Kenedy County, TX, inside the ERCOT balancing area.
Penascal II Wind Project is operated by Avangrid Power LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Penascal II Wind Project reported 316.2 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Penascal II Wind Project ranks #249 of 1,374 operating plants of the same technology nationally. It ranks #84 of 230 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.