Ramona Solar Energy, also called the Creelman Project, is a solar photovoltaic plant owned and operated by SDG&E in San Diego County. EIA’s August 2026 inventory lists 4.3 MW nameplate capacity and April 2017 as its operating month. SDG&E’s solar-program compliance report separately gives design ratings of 4.32 MW CEC-ac and 4.95 MWdc and deems commercial operation effective April 1, 2017. The project supplies SDG&E’s distribution grid near Creelman Lane and Ashley Road; it is utility-owned generation rather than a third-party power purchase.
Mapped infrastructure geometry associated with this asset.
EIA plant 60995 · Inventory for Aug 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | Operating | 4.3 | Unknown |
Yes. Ramona, also known as the Creelman Project, is SDG&E utility-owned solar generation developed under the CPUC Solar Energy Project program. Its engineering and permitting role is attributed to Independent Energy Solutions; the compliance report does not identify the defaulting EPC contractor by name.
Source: SDG&E Solar Energy Project compliance report · as of 2026-10-22
The page’s 4.3 MW is EIA nameplate capacity. SDG&E’s compliance report separately reports 4.32 MW CEC-ac and 4.95 MWdc. These are different AC/DC and rating conventions. The latest August 2026 EIA workbook lists 4.9 MW DC net capacity; these values should retain their source and measurement labels.
Source: SDG&E Solar Energy Project compliance report · as of 2026-10-22
SDG&E deemed commercial operation effective April 1, 2017, after the facility began delivering full output in March. Remote monitoring began April 21. EIA lists April 2017 as the operating month. Contractual substantial completion and remote monitoring are separate milestones.
Source: SDG&E Solar Energy Project compliance report · as of 2026-10-22
Similar plants ranked by technology, capacity, and distance.
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| 1 | 4.3 MW 3.7 MW summer | Solar Photovoltaic Solar · PV | Apr 2017 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
Decision D.10-09-016 established the Solar Energy Project program, authorizing SDG&E to build and own up to 26 MWdc of distributed solar PV projects on its distribution system, with individual projects not exceeding 5 MW.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Palomar Energy | 559 MW | CA | |
| Miramar Energy Facility | 106 MW | CA | |
| Cuyamaca Peak Energy Plant | 48.7 MW | CA | |
| Fallbrook Energy Storage | 40 MW | CA | |
| Top Gun Energy Storage | 30 MW | CA | |
| Melrose BESS | 20 MW | CA | |
| Elliott Energy Storage | 10 MW | CA | |
| Boulevard Energy Storage | 10 MW | CA |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioSan Diego County issued environmental permitting approvals in October and December 2015.
SDG&E and its EPC contractor entered into a construction contract on March 1, 2016; construction began on or about July 1, 2016.
The facility failed to achieve contractual substantial completion by September 23, 2016. By December 2016, the EPC contractor was in contractual default.
In February 2017, work resumed through the lead subcontractor following the EPC contractor's default.
On or about March 22, 2017, the site began delivering full output to the grid, though it never achieved substantial completion under the EPC contract.
EIA-860 lists generator 1 with this operating date.
SDG&E deemed commercial operation effective April 1, 2017.
Remote monitoring was not effectuated until April 21, 2017.
SDG&E terminated its contract with the EPC contractor in late April 2017.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Yes. Ramona, also known as the Creelman Project, is SDG&E utility-owned solar generation developed under the CPUC Solar Energy Project program. Its engineering and permitting role is attributed to Independent Energy Solutions; the compliance report does not identify the defaulting EPC contractor by name.
The page’s 4.3 MW is EIA nameplate capacity. SDG&E’s compliance report separately reports 4.32 MW CEC-ac and 4.95 MWdc. These are different AC/DC and rating conventions. The latest August 2026 EIA workbook lists 4.9 MW DC net capacity; these values should retain their source and measurement labels.
SDG&E deemed commercial operation effective April 1, 2017, after the facility began delivering full output in March. Remote monitoring began April 21. EIA lists April 2017 as the operating month. Contractual substantial completion and remote monitoring are separate milestones.
Ramona Solar Energy reports 4.3 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Aug 2026.
Ramona Solar Energy is a Solar Photovoltaic facility in San Diego County, CA, participating in the CAISO market.
Ramona Solar Energy is in San Diego County, CA, inside the CAISO balancing area.
Ramona Solar Energy is operated by San Diego Gas & Electric Co according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Ramona Solar Energy reported 5 GWh over the twelve months to 2024-12. Figures are net generation as filed to EIA-923.
By capacity, Ramona Solar Energy ranks #3,356 of 7,597 operating plants of the same technology nationally. It ranks #377 of 972 in CA.