Blooming Grove Wind Energy Center is a 250 MW wind farm in McLean County, Illinois, that commenced commercial operations in December 2020. It runs 94 GE turbines. Output is sold under virtual power purchase agreements of 130 MW to Verizon and 120 MW to Saint-Gobain North America.
EIA plant 63988 · Inventory for Aug 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| GEN1 | Onshore Wind Turbine | Operating | 250 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| GEN1 | 250 MW 250 MW summer | Onshore Wind Turbine Wind · WT | Dec 2020 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
Blooming Grove commenced commercial operations.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Lackawanna Energy Center | 1,498.5 MW | PA | |
| Grays Harbor Energy Facility | 714.9 MW | WA | |
| Nelson Energy Center | 627.5 MW | IL | |
| Hardee Power Station | 470.1 MW | FL | |
| Spindle Hill Energy Center | 420 MW | CO | |
| Invenergy Nelson Expansion LLC | 380 MW | IL | |
| Cannon Falls Energy Center | 346.8 MW | MN | |
| Delilah Solar Energy II LLC | 310 MW | TX |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioAnswered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Blooming Grove Wind Energy Center reports 250 MW wind of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Aug 2026.
Blooming Grove Wind Energy Center is a Onshore Wind Turbine facility in Livingston County, IL, participating in the PJM market.
Blooming Grove Wind Energy Center is in Livingston County, IL, inside the PJM balancing area.
Blooming Grove Wind Energy Center is operated by Invenergy Services LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Blooming Grove Wind Energy Center reported 845.7 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Blooming Grove Wind Energy Center ranks #145 of 1,374 operating plants of the same technology nationally. It ranks #6 of 57 in IL.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.