Timmerman Power Plant is a natural-gas-fueled peaker facility near Maxwell in Caldwell County, Texas, owned and operated by the Lower Colorado River Authority. It comprises two generating units, each powered by 10 Wärtsilä 50SG reciprocating engines (20 engines total). Unit 1 connected to the grid in August 2025 and Unit 2 in April 2026. The fully operational plant provides approximately 372 MW (net maximum capacity) of dispatchable generation to the ERCOT grid. The plant can ramp up and shut down in minutes to supply power during peak demand periods.
Mapped infrastructure geometry associated with this asset.
EIA plant 66335 · Inventory for Oct 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| G1 | Natural Gas Internal Combustion Engine | Operating | 18 | Unknown |
| G10 | Natural Gas Internal Combustion Engine | Operating | 18 | Unknown |
| G11 | Natural Gas Internal Combustion Engine | Operating | 18.8 | Unknown |
| G12 | Natural Gas Internal Combustion Engine | Operating | 18.8 | Unknown |
| G13 |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| G1 | 18 MW 18 MW summer | Natural Gas Internal Combustion Engine IC | Aug 2025 | Operating |
| G10 | 18 MW 18 MW summer | Natural Gas Internal Combustion Engine IC | Aug 2025 | Operating |
| G11 | 18.8 MW 18.6 MW summer | Natural Gas Internal Combustion Engine IC | Apr 2026 | Operating |
| G12 | 18.8 MW 18.6 MW summer | Natural Gas Internal Combustion Engine IC | Apr 2026 | Operating |
| G13 | 18.8 MW | |||
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Where the plant sits in ERCOT: its market, pricing node, utility territory and the network around it, each with how it is known.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
Lower Colorado River Authority selected Fagen, Inc. to design and build the Timmerman Power Plant.
| Natural Gas Internal Combustion Engine |
| Operating |
| 18.8 |
| Unknown |
| G14 | Natural Gas Internal Combustion Engine | Operating | 18.8 | Unknown |
|---|
| G15 | Natural Gas Internal Combustion Engine | Operating | 18.8 | Unknown |
|---|
| G16 | Natural Gas Internal Combustion Engine | Operating | 18.8 | Unknown |
|---|
| G17 | Natural Gas Internal Combustion Engine | Operating | 18.8 | Unknown |
|---|
| G18 | Natural Gas Internal Combustion Engine | Operating | 18.8 | Unknown |
|---|
| G19 | Natural Gas Internal Combustion Engine | Operating | 18.8 | Unknown |
|---|
| G2 | Natural Gas Internal Combustion Engine | Operating | 18 | Unknown |
|---|
| G20 | Natural Gas Internal Combustion Engine | Operating | 18.8 | Unknown |
|---|
| G3 | Natural Gas Internal Combustion Engine | Operating | 18 | Unknown |
|---|
| G4 | Natural Gas Internal Combustion Engine | Operating | 18 | Unknown |
|---|
| G5 | Natural Gas Internal Combustion Engine | Operating | 18 | Unknown |
|---|
| G6 | Natural Gas Internal Combustion Engine | Operating | 18 | Unknown |
|---|
| G7 | Natural Gas Internal Combustion Engine | Operating | 18 | Unknown |
|---|
| G8 | Natural Gas Internal Combustion Engine | Operating | 18 | Unknown |
|---|
| G9 | Natural Gas Internal Combustion Engine | Operating | 18 | Unknown |
|---|
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at TIMPP_RN1 over 365 days (2025-11-27 to 2026-11-26). This plant is also crosswalked to TIMPP_RN2, TIMPP_RN3, TIMPP_RN4, TMPP_RN3, TMPP_RN4; the point with the deepest price history is shown.
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
The site also falls inside the Bluebonnet Electric Coop, Inc and Guadalupe Valley Elec Coop Inc service territories.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Fayette Power Project | 1,690 MW | TX | |
| Sim Gideon | 623 MW | TX | |
| Lost Pines 1 Power Project | 609 MW | TX | |
| Thomas C Ferguson | 574.6 MW | TX | |
| Timmerman Power PlantCurrent | 368 MW | TX | |
| Winchester Power Park | 242 MW | TX | |
| Marshall Ford | 108 MW | TX | |
| Buchanan Dam (TX) | 54.9 MW | TX |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioLower Colorado River Authority announced the addition of a second generating unit at the Timmerman Power Plant.
Texas Commission on Environmental Quality declared Title V air permit application 4766 for Timmerman Power Plant technically complete.
EIA-860 lists generator G1, generator G10, generator G2, generator G3, generator G4, generator G5, generator G6, generator G7, generator G8, generator G9 with this operating date.
Unit 1 of Timmerman Power Plant entered commercial operation and began supplying power to the ERCOT grid.
EIA-860 lists generator G11, generator G12, generator G13, generator G14, generator G15, generator G16, generator G17, generator G18, generator G19, generator G20 with this operating date.
Unit 2 of Timmerman Power Plant connected to the grid, bringing the entire facility to full operational status.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Timmerman Power Plant reports 368 MW natural gas of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Oct 2026.
Timmerman Power Plant is a Natural Gas Internal Combustion Engine facility in Caldwell County, TX, participating in the ERCOT market.
Timmerman Power Plant is in Caldwell County, TX, inside the ERCOT balancing area.
Timmerman Power Plant is operated by Lower Colorado River Authority according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Timmerman Power Plant reported 207.9 GWh over the twelve months to 2025-12. Figures are net generation as filed to EIA-923.
By capacity, Timmerman Power Plant ranks #1 of 410 operating plants of the same technology nationally. It ranks #1 of 149 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.