Nobles Wind Project
Nobles Wind Project reports 201 MW wind in MISO.
Overview
- Registry anchor
- Plant 57047
- plant-57047
Infrastructure record
- Turbines
- 9
- Manufacturers
- GE Wind
- In service
Nobles Wind Project reports 201 MW wind in MISO.
EIA plant 57047 · Inventory for Aug 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | Operating | 201 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Wind · 205.5 MW
Murray County
Wind · 200 MW
Rock County
Wind · 205.5 MW
Jackson County
Wind · 200 MW
Cottonwood County
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| 1 | 201 MW 201 MW summer | Onshore Wind Turbine Wind · WT | Dec 2010 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Sherburne County | 1,704 MW | MN | |
| Prairie Island | 1,186.2 MW | MN | |
| Monticello Nuclear Facility | 685 MW | MN | |
| High Bridge | 644 MW | MN | |
| Allen S King | 598.4 MW | MN | |
| Riverside (MN) | 585.9 MW | MN | |
Project milestones and public references behind the asset profile.
EIA-860 lists generator 1 with this operating date.
201 MW, 134 turbines
Larger rotors on 134 turbines
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Nobles Wind Project reports 201 MW wind of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Aug 2026.
Nobles Wind Project is a Onshore Wind Turbine facility in Nobles County, MN, participating in the MISO market.
Nobles Wind Project is in Nobles County, MN, inside the MISO balancing area.
Nobles Wind Project is operated by Northern States Power Co - Minnesota according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Nobles Wind Project reported 779.6 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Nobles Wind Project ranks #261 of 1,374 operating plants of the same technology nationally. It ranks #6 of 122 in MN.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.