Operating 240 MW solar photovoltaic facility in Spotsylvania County, Virginia, using single-axis tracking crystalline-silicon photovoltaic arrays and no energy storage. Together with Pleinmont Solar 1, it was subject to Microsoft's 315 MW energy purchase agreement announced in March 2018.
Mapped infrastructure geometry associated with this asset.
EIA plant 62013 · Inventory for Oct 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| PLNM2 | Solar Photovoltaic | Operating | 240 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| PLNM2 | 240 MW 240 MW summer | Solar Photovoltaic PV | Aug 2021 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Where the plant sits in PJM: its market, pricing node, utility territory and the network around it, each with how it is known.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
Microsoft Corporation announced the purchase of 315 MW of energy from Pleinmont I and II projects jointly. The exact allocation between the two plants is not specified; the combined announcement represents the single largest corporate solar purchase at the time.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Pleinmont Solar 2Current | 240 MW | VA | |
| Buffalo Gap 2 Wind Farm | 232.5 MW | TX | |
| Prevailing Wind Park | 220 MW | SD | |
| Skipjack Solar Center | 175 MW | VA | |
| Buffalo Gap 3 Wind Farm | 170.2 MW | TX | |
| Highlander Solar Energy Station 1 | 165 MW | VA | |
| Lancaster Area Battery | 127 MW | CA | |
| Buffalo Gap Wind Farm | 120.6 MW | TX |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioEIA-860 lists generator PLNM2 with this operating date.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Pleinmont Solar 2 reports 240 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Oct 2026.
Pleinmont Solar 2 is a Solar Photovoltaic facility in Spotsylvania County, VA, participating in the PJM market.
Pleinmont Solar 2 is in Spotsylvania County, VA, inside the PJM balancing area.
Pleinmont Solar 2 is operated by AES Distributed Energy according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Pleinmont Solar 2 reported 444.7 GWh over the twelve months to 2026-08. Figures are net generation as filed to EIA-923.
By capacity, Pleinmont Solar 2 ranks #120 of 7,597 operating plants of the same technology nationally. It ranks #1 of 144 in VA.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.