Eagle Pass–Piedras Negras AC bypass

ERCOT ↔ Mexico (CFE) · AC transmission

The 138 kV border line from AEP's Eagle Pass substation to Piedras Negras can use a synchronous bypass for emergency block-load transfers under Presidential Permit PP-424. This is the physical AC bypass route, separate from the Eagle Pass DC converter that ERCOT permanently removed from service in 2020. AEP's 2024 filing records a block-load transfer relay upgrade at Eagle Pass, while DOE continues to list the 138 kV border facility. The marker is at the U.S. substation; no continuous live flow is attributed to this normally open mode.

Now
—No current reading

Hardware

Its terminals, placed from named HIFLD substations or other cited geospatial sources where available.

Substation
Eagle Pass, TX

28.7160, -100.4904 · 138 kV

Substation
Piedras Negras, Coahuila

In Mexico, outside HIFLD's coverage

Sources and method

No operator flow feed is linked to this profile. The map and hardware describe the registered connection, not a current power transfer. A rating describes the equipment; an operator’s posted directional limit, when available, is a separate operating value. The map point identifies a sourced terminal or crossing where available, or a representative connection point; it does not trace the full route.

How intertie coverage is assembled