Explore data centers and published industrial facilities, with development status, disclosed power requirements, and source-backed grid context.
| Asset | Reported | |
|---|---|---|
| 50 MWCritical IT Load · Reported · campus | ||
| 114 MWCapacity basis unspecified · Reported · campus | ||
| Not disclosedNo exact-asset power figure · building | ||
| 11 MWCapacity basis unspecified · Reported · campus | ||
| 5 MWCapacity basis unspecified · Reported · facility | ||
| 24 MWCampus Gross Power · Proposed · campus | ||
| 45 MWCapacity basis unspecified · Reported · facility | ||
| 12 MWCapacity basis unspecified · Reported · facility | ||
| Not disclosedNo exact-asset power figure · facility | ||
| 35 MWCritical IT Load · Reported · campus | ||
| 19 MWUtility Service · Reported · campus | ||
| 105 MWUtility Service · Reported · facility | ||
| Not disclosedNo exact-asset power figure · facility | ||
| 24 MWUtility Service · Reported · facility | ||
| 38 MWCapacity basis unspecified · Reported · facility | ||
| 40 MWUtility Service · Reported · facility | ||
| 6 MWCapacity basis unspecified · Reported · facility | ||
| 4 MWCapacity basis unspecified · Reported · facility | ||
| 3 MWCapacity basis unspecified · Reported · facility | ||
| Up to 90 MWCapacity basis unspecified · Proposed · campus | ||
| Not disclosedNo exact-asset power figure · facility | ||
| 9 MWCritical IT Load · Reported · facility |
Large-load records describe individual facilities and development scopes. Requested, contracted, planned, and operating power are distinct measures; figures at different scopes are not additive.
Geographic directories use the state and city recorded for each asset. Organization groups preserve published names and roles. Utility groups use the utility named in the facility record; individual profiles distinguish service agreements from service-territory matches. Each profile carries the sources and dates behind its facts.