Lake County, CA power plants
4 EIA-registered power plants in Lake County, CA totalling 292.4 MW of nameplate capacity, ranked and mapped inside CAISO.
- Plants
- 4
- Nameplate capacity
- 292.4 MW
- Largest
- 176.4 MW
EIA-registered records
Sum across this county
Calistoga Power Plant
Capacity by fuel
other254.4 MW2 plantsbatteries38 MW2 plants
Lake County, CA capacity ranking
4 matching plants·ranked by nameplate capacity
| Rank | Plant | Capacity | Technology | Operator | Location | |
|---|---|---|---|---|---|---|
| 1 | Calistoga Power PlantGeysers Power Co LLC | 176.4 MW | Geothermal | Geysers Power Co LLC | Lake County | |
| 2 | Sonoma California GeothermalGeysers Power Co LLC | 78 MW | Geothermal | Geysers Power Co LLC | Lake County | |
| 3 | West Ford FlatWest Ford Flat Energy Storage | 25 MW | Batteries | West Ford Flat Energy Storage | Lake County | |
| 4 | Bear CanyonBear Canyon Energy Storage | 13 MW | Batteries | Bear Canyon Energy Storage | Lake County |
Technology rankings in CAISO
Other CAISO counties
Kern County, CA16.6 GWRiverside County, CA10.9 GWLos Angeles County, CA7.2 GWSan Bernardino County, CA6.4 GWFresno County, CA5.7 GWSan Diego County, CA4.6 GWContra Costa County, CA4.2 GWSan Luis Obispo County, CA3.6 GWKings County, CA2.8 GWImperial County, CA2.4 GWMonterey County, CA2.4 GWVentura County, CA2 GW
All CAISO countiesCounty assignment and capacity come from the EIA generator inventory. Capacity is nameplate capacity, not seasonal capability or available operating capacity. A plant can include multiple generators and technologies.