Plumas County, CA power plants
9 EIA-registered power plants in Plumas County, CA totalling 570.8 MW of nameplate capacity, ranked and mapped inside CAISO.
- Plants
- 9
- Nameplate capacity
- 570.8 MW
- Largest
- 126 MW
EIA-registered records
Sum across this county
Rock Creek
Capacity by fuel
hydroelectric530.6 MW7 plantsbiomass40.2 MW2 plants
Plumas County, CA capacity ranking
9 matching plants·ranked by nameplate capacity
| Rank | Plant | Capacity | Technology | Operator | Location | |
|---|---|---|---|---|---|---|
| 1 | Rock CreekPacific Gas & Electric Co. | 126 MW | Conventional Hydroelectric | Pacific Gas & Electric Co. | Plumas County | |
| 2 | BeldenPacific Gas & Electric Co. | 117.9 MW | Conventional Hydroelectric | Pacific Gas & Electric Co. | Plumas County | |
| 3 | Caribou 2Pacific Gas & Electric Co. | 117.9 MW | Conventional Hydroelectric | Pacific Gas & Electric Co. | Plumas County | |
| 4 | Caribou 1Pacific Gas & Electric Co. | 73.8 MW | Conventional Hydroelectric | Pacific Gas & Electric Co. | Plumas County | |
| 5 | Butt ValleyPacific Gas & Electric Co. | 40 MW | Conventional Hydroelectric | Pacific Gas & Electric Co. | Plumas County | |
| 6 | Sierra Pacific Quincy FacilitySierra Pacific Industries | 35.2 MW | Wood/Wood Waste Biomass | Sierra Pacific Industries | Plumas County | |
| 7 | Bucks CreekPacific Gas & Electric Co. | 33 MW | Conventional Hydroelectric | Pacific Gas & Electric Co. | Plumas County | |
| 8 | GrizzlyCity of Santa Clara - (CA) | 22 MW | Conventional Hydroelectric | City of Santa Clara - (CA) | Plumas County | |
| 9 | Collins Pine ProjectCollins Pine Co | 5 MW | Wood/Wood Waste Biomass | Collins Pine Co | Plumas County |
Technology rankings in CAISO
Other CAISO counties
Kern County, CA16.6 GWRiverside County, CA10.9 GWLos Angeles County, CA7.2 GWSan Bernardino County, CA6.4 GWFresno County, CA5.7 GWSan Diego County, CA4.6 GWContra Costa County, CA4.2 GWSan Luis Obispo County, CA3.6 GWKings County, CA2.8 GWImperial County, CA2.4 GWMonterey County, CA2.4 GWVentura County, CA2 GW
All CAISO countiesCounty assignment and capacity come from the EIA generator inventory. Capacity is nameplate capacity, not seasonal capability or available operating capacity. A plant can include multiple generators and technologies.