San Mateo County, CA power plants
8 EIA-registered power plants in San Mateo County, CA totalling 29 MW of nameplate capacity, ranked and mapped inside CAISO.
- Plants
- 8
- Nameplate capacity
- 29 MW
- Largest
- 11.4 MW
EIA-registered records
Sum across this county
Ameresco Ox Mountain
Capacity by fuel
biomass13.6 MW2 plantsnatural gas8.1 MW3 plantsbatteries3.8 MW1 plantsolar3.5 MW2 plants
San Mateo County, CA capacity ranking
8 matching plants·ranked by nameplate capacity
| Rank | Plant | Capacity | Technology | Operator | Location | |
|---|---|---|---|---|---|---|
| 1 | Ameresco Ox MountainAMERESCO Ox Mountain Energy LLC | 11.4 MW | Landfill Gas | AMERESCO Ox Mountain Energy LLC | San Mateo County | |
| 2 | SRI International Cogen ProjectIPT SRI Cogeneration Inc | 6 MW | Natural Gas Fired Combustion Turbine | IPT SRI Cogeneration Inc | San Mateo County | |
| 3 | Google Bayhill Solar PV and MicrogridGoogle, Inc. | 3.8 MW | Batteries, Solar Photovoltaic | Google, Inc. | San Mateo County | |
| 4 | Silicon Valley Clean WaterSilicon Valley Clean Water | 2.2 MW | Other Waste Biomass, Batteries | Silicon Valley Clean Water | San Mateo County | |
| 5 | Shelter Creek Condominiums SolarVista Solar, Inc. | 1.9 MW | Solar Photovoltaic | Vista Solar, Inc. | San Mateo County | |
| 6 | Gilead Foster City Solar ProjectGilead Sciences Inc. Foster City | 1.6 MW | Solar Photovoltaic, Batteries | Gilead Sciences Inc. Foster City | San Mateo County | |
| 7 | Franklin Templeton San MateoBloom Energy | 1.1 MW | Other Natural Gas | Bloom Energy | San Mateo County | |
| 8 | AT&T - Redwood CityBloom Energy | 1 MW | Other Natural Gas | Bloom Energy | San Mateo County |
Technology rankings in CAISO
Other CAISO counties
Kern County, CA16.6 GWRiverside County, CA10.9 GWLos Angeles County, CA7.2 GWSan Bernardino County, CA6.4 GWFresno County, CA5.7 GWSan Diego County, CA4.6 GWContra Costa County, CA4.2 GWSan Luis Obispo County, CA3.6 GWKings County, CA2.8 GWImperial County, CA2.4 GWMonterey County, CA2.4 GWVentura County, CA2 GW
All CAISO countiesCounty assignment and capacity come from the EIA generator inventory. Capacity is nameplate capacity, not seasonal capability or available operating capacity. A plant can include multiple generators and technologies.