In effect now
Restricted Maintenance Operations
Since Oct 6, 2026, 10:00 AM PDT
EEA days since Sep 9
0
NERC Energy Emergency Alert, any level
Warning or emergency days since Sep 9
0
4 days with any capacity alert · 3 covered all of CAISO
Ask the Grid's record of CAISO's postings begins Sep 9, 2026; earlier days this year are not counted.
Days with a capacity declaration since Sep 9
| Alert or higher | 4 |
| Warning or higher | 0 |
| Emergency action or higher | 0 |
| Load shed or higher |
CAISO starts with Restricted Maintenance Operations, which asks generators and transmission owners to postpone maintenance, then an EEA Watch, then Energy Emergency Alert levels 1 to 3. Flex Alerts ask the public to conserve alongside them.
A day counts when a capacity declaration at alert or above covers any part of it, in the market's own time zone, whether it covered the whole footprint or one region. Each day takes the highest step and NERC EEA level declared that day, and overlapping or renewed postings count once. Drills are never counted.
Every operator names its steps differently. Ask the Grid places each on one ladder, advisory, alert, warning, emergency action and load shed, with the NERC EEA level the operator states or its procedure defines, so a day here means the same thing in every market.
The EEA counts at the top of this page say, with each day it was declared. They come from CAISO's own postings and update within minutes of a new one.
An alert says supply may be tight ahead of time. A warning says reserves are short or about to be. An emergency action means the operator is already using emergency resources, and load shed means it is cutting load to protect the grid.
A balancing area or region under an EEA is the market under an emergency there. The page shows how many days covered the whole footprint separately, and marks each declaration with where it applied.
| 0 |
| EEA 1 or higher | 0 |
| EEA 2 or higher | 0 |
| EEA 3 | 0 |
Market days with a capacity declaration anywhere in CAISO. Drills are left out.
| From | CAISO's notice | Level | Applies to |
|---|---|---|---|
| Oct 6, 2026, 10:00 AM PDT | Restricted Maintenance Operations | Alert | All of CAISO |
| Oct 6, 2026, 10:00 AM PDT | Restricted Maintenance Operations | Alert | Southern CA Region |
| Oct 5, 2026, 10:00 AM PDT | Restricted Maintenance Operations | Alert | Southern CA Region |
| Oct 5, 2026, 10:00 AM PDT | Restricted Maintenance Operations | Alert | All of CAISO |
| Sep 10, 2026, 10:00 AM PDT | Restricted Maintenance Operations | Alert | All of CAISO |
| Sep 9, 2026, 10:00 AM PDT | Restricted Maintenance Operations | Alert | Southern CA Region |
Capacity declarations anywhere, and footprint-wide notices of other kinds, newest first. Local transmission relief postings are left out.
From the first CAISO posting Ask the Grid recorded. If that is later than January 1, the page says so, and days before it are not counted.
What Ask the Grid's detectors found in CAISO's published data over the last two weeks, the most material episode of each kind per day.
Operator noticeOngoing
Restricted Maintenance Operations declared for CAISO Grid, effective 10/06/2026 10:00 - 10/06/2026 22:00 - 202673071981 Notice No: 20267307…. CAISO is at the alert step of its operator's procedures; in effect since Oct 6, 10:00 AM PDT.
Operator notice
Restricted Maintenance Operations declared for CAISO Grid, effective 10/05/2026 10:00 - 10/05/2026 22:00 - 202665742263 Notice No: 20266574…. CAISO is at the alert step of its operator's procedures; in effect since Oct 5, 10:00 AM PDT.